10,000-TPD Sugar Cane Tandem Diffuser & Mill

Product family: Raw VHP Sugar & Bagasse CHP.

Flow: 24h Cut Cane Field Wagons → Shredder & 5-Mill Tandem Crush → Bagasse Boiler Co-Gen Steam → Lime Clarify & 5-Effect Evap → Vacuum Pan Crystal & Spin → Bulk Sugar Warehouse Silo → Sugar Refineries & Ethanol

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 10,000-TPD Sugar Cane Tandem Diffuser & MillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 24h Cut Cane Field Wagons → Shredder & 5-Mill Tandem Crush (131 s) → Bagasse Boiler Co-Gen Steam (162 s) → Lime Clarify & 5-Effect Evap (206 s) → Vacuum Pan Crystal & Spin (143 s) → Bulk Sugar Warehouse Silo (108 s) → Sugar Refineries & Ethanol.SUPPLIER24h Cut CaneField WagonsI0.90 d1Shredder & 5-MillTandem CrushC/T 131 sI1.50 d2Bagasse BoilerCo-Gen SteamC/T 162 sI2.00 d3Lime Clarify &5-Effect EvapC/T 206 sI1.10 d4Vacuum PanCrystal & SpinC/T 143 sI1.00 d5Bulk SugarWarehouse SiloC/T 108 sI1.50 dCUSTOMERSugarRefineries &…420 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Shredder & 5-Mill Tandem Crush131 s12 min94%98.2%210378 (0.90 d)561
2. Bagasse Boiler Co-Gen Steam162 s20 min91%97.1%252630 (1.50 d)431
3. Lime Clarify & 5-Effect Evap206 s35 min84%95.5%336840 (2.00 d)305
4. Vacuum Pan Crystal & Spin143 s15 min93%98.1%168462 (1.10 d)502
5. Bulk Sugar Warehouse Silo108 s10 min97%99.3%126420 (1.00 d)705

Key figures

Takt time
193 s
Lead time
8.01 d
Value-added time
750 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
420 tonnes
Line capacity per day
305 tonnes
Bottleneck
Lime Clarify & 5-Effect Evap

Reading the bottleneck

The bottleneck is "Lime Clarify & 5-Effect Evap": it can process 305 tonnes per day against a demand of 420 tonnes, so it falls short of demand by 27.3%. Once downtime and scrap are counted, its cycle time grows from 206 s to 257 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 84%), about 39.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Commodities, Coffee, Cocoa & Forestry: Commodities, Coffee, Cocoa & Forestry