Hydroponics, Aquaculture & Livestock Ops VSM Scenarios
12 scenarios of Hydroponics, Aquaculture & Livestock Ops, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Seedling / Fry / Feed Intake → Controlled-Climate / Tank Grow → Harvest / Milking / Catch Peak → Biosecurity & Residue Assay → Cold / Live-Haul Dispatch. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Fully Automated LED Indoor Hydroponic Vertical Farm | 6,500 packs per day | 2 | 8.3 s | 4.50 d | 0.013% | Auto Crane Tower Harvest |
| Land-Based RAS Recirculating Salmon Smolt Farm | 850 crates per day | 3 | 95.3 s | 4.50 d | 0.099% | Optical Biomass Size Grade |
| Automated Rotary & Robotic Milking Parlor | 48 batches per day | 2 | 1,125 s | 4.58 d | 1.7% | Inline SCC & Mastitis Divert |
| 30-Ton/Hr Steam-Pelleted Livestock Feed Mill | 280 tonnes per day | 3 | 289 s | 4.51 d | 0.30% | 85°C Salmonellosis Condition |
| Zero-Exchange Biofloc Vannamei Shrimp Harvest | 320 crates per day | 2 | 169 s | 4.51 d | 0.26% | Ice-Slurry Instant Stunning |
| Centrifugal Raw Monofloral Honey Uncap & Jar | 4,200 packs per day | 1 | 6.4 s | 4.50 d | 0.020% | 80-Frame Radial Extractor Spin |
| Automated Grafted Tomato & Pepper Plug Nursery | 18,000 units per day | 1 | 1.5 s | 4.50 d | 0.005% | 95%-RH Healing Chamber Callus |
| Automated In-Ovo Vaccine & Day-Old Chick Hatchery | 240 crates per day | 2 | 225 s | 4.52 d | 0.35% | 3-Day Hatcher Basket Emergence |
| Humane Night Modular-Drawer Broiler Harvest Loop | 180 crates per day | 2 | 300 s | 4.52 d | 0.47% | Ventilated Curtain Truck Haul |
| Synchronized Forage Harvester & Bunker Compaction | 65 batches per day | 2 | 831 s | 4.58 d | 1.3% | Layer-by-Layer Clamp Push |
| Tubular Photobioreactor Astaxanthin Algae Harvest | 18 batches per day | 3 | 4,500 s | 4.71 d | 4.5% | Centrifuge & Bead-Mill Crack |
| Tidal Bed Oyster Tumbler Grading & Purification | 480 crates per day | 1 | 56.3 s | 4.51 d | 0.18% | Optical Weight & Size Drop |