Tidal Bed Oyster Tumbler Grading & Purification
Product family: Live Depurated Oyster Crates.
Flow: Intertidal Bag Farms → High-Pressure Mud Tumbler Wash → 48h UV-Flow Depuration Tank → Optical Weight & Size Drop → Wet Seaweed & Wooden Basket → Ice-Gel 4°C Night Express → Restaurants & Seafood Bars
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. High-Pressure Mud Tumbler Wash | 37.1 s | 12 min | 95% | 97.8% | 240 | 432 (0.90 d) | 640 |
| 2. 48h UV-Flow Depuration Tank | 46.0 s | 15 min | 93% | 96.8% | 240 | 576 (1.20 d) | 493 |
| 3. Optical Weight & Size Drop | 60.0 s | 25 min | 85% | 94.5% | 144 | 480 (1.00 d) | 295 |
| 4. Wet Seaweed & Wooden Basket | 41.0 s | 6 min | 96% | 98.8% | 96 | 240 (0.50 d) | 583 |
| 5. Ice-Gel 4°C Night Express | 30.4 s | 8 min | 97% | 99.4% | 96 | 192 (0.40 d) | 780 |
Key figures
- Takt time
- 56.3 s
- Lead time
- 4.51 d
- Value-added time
- 215 s
- Process cycle efficiency (PCE)
- 0.18%
- Rolled throughput yield (RTY)
- 87.9%
- Customer demand per day
- 480 crates
- Line capacity per day
- 295 crates
- Bottleneck
- Optical Weight & Size Drop
Reading the bottleneck
The bottleneck is "Optical Weight & Size Drop": it can process 295 crates per day against a demand of 480 crates, so it falls short of demand by 38.6%. Once downtime and scrap are counted, its cycle time grows from 60.0 s to 74.7 s, against a takt of 56.3 s. The largest loss at this step is equipment downtime (uptime 85%), about 10.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hydroponics, Aquaculture & Livestock Ops: Hydroponics, Aquaculture & Livestock Ops
- Fully Automated LED Indoor Hydroponic Vertical Farm
- Land-Based RAS Recirculating Salmon Smolt Farm
- Automated Rotary & Robotic Milking Parlor
- 30-Ton/Hr Steam-Pelleted Livestock Feed Mill
- Zero-Exchange Biofloc Vannamei Shrimp Harvest
- Centrifugal Raw Monofloral Honey Uncap & Jar
- Automated Grafted Tomato & Pepper Plug Nursery
- Automated In-Ovo Vaccine & Day-Old Chick Hatchery
- Humane Night Modular-Drawer Broiler Harvest Loop
- Synchronized Forage Harvester & Bunker Compaction
- Tubular Photobioreactor Astaxanthin Algae Harvest