Automated Rotary & Robotic Milking Parlor

Product family: Low-SCC Chilled Raw Milk.

Flow: Pasture & TMR Ration Wagons → RFID Cow Gate & Teat Brush → Laser-Guided Cup Attach & Milk → Inline SCC & Mastitis Divert → Plate Cooler Instant to 3.5°C → Daily Insulated Silo Tanker → UHT & Cheese Tanker Co-ops

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Rotary & Robotic Milking ParlorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pasture & TMR Ration Wagons → RFID Cow Gate & Teat Brush (743 s) → Laser-Guided Cup Attach & Milk (923 s) → Inline SCC & Mastitis Divert (1,204 s) → Plate Cooler Instant to 3.5°C (810 s) → Daily Insulated Silo Tanker (608 s) → UHT & Cheese Tanker Co-ops.SUPPLIERPasture & TMRRation WagonsI0.90 d1RFID Cow Gate &Teat BrushC/T 743 sI1.21 d2Laser-Guided CupAttach & MilkC/T 923 sI1.00 d3Inline SCC &Mastitis DivertC/T 1,204 sI0.50 d4Plate CoolerInstant to 3.5°CC/T 810 sI0.40 d5Daily InsulatedSilo TankerC/T 608 sI0.50 dCUSTOMERUHT & CheeseTanker Co-ops48 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RFID Cow Gate & Teat Brush743 s12 min95%97.8%2443 (0.90 d)66
2. Laser-Guided Cup Attach & Milk923 s15 min93%96.8%2458 (1.21 d)51
3. Inline SCC & Mastitis Divert1,204 s25 min85%94.5%1448 (1.00 d)33
4. Plate Cooler Instant to 3.5°C810 s6 min96%98.8%1024 (0.50 d)61
5. Daily Insulated Silo Tanker608 s8 min97%99.4%1019 (0.40 d)82

Key figures

Takt time
1,125 s
Lead time
4.58 d
Value-added time
4,288 s
Process cycle efficiency (PCE)
1.7%
Rolled throughput yield (RTY)
87.9%
Customer demand per day
48 batches
Line capacity per day
33 batches
Bottleneck
Inline SCC & Mastitis Divert

Reading the bottleneck

The bottleneck is "Inline SCC & Mastitis Divert": it can process 33 batches per day against a demand of 48 batches, so it falls short of demand by 32.1%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,499 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 85%), about 212 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hydroponics, Aquaculture & Livestock Ops: Hydroponics, Aquaculture & Livestock Ops