Tubular Photobioreactor Astaxanthin Algae Harvest

Product family: Closed-Loop Nutraceutical Powder.

Flow: Food-Grade CO2 & Salts → Green Phase Photobioreactor → UV Light-Stress Carotenoid → Centrifuge & Bead-Mill Crack → Spray-Dry Nitrogen Inerting → HPLC Astaxanthin Assay Bag → Supplement & Aqua Feed Buyers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Tubular Photobioreactor Astaxanthin Algae HarvestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Food-Grade CO2 & Salts → Green Phase Photobioreactor (2,970 s) → UV Light-Stress Carotenoid (3,690 s) → Centrifuge & Bead-Mill Crack (4,815 s) → Spray-Dry Nitrogen Inerting (3,240 s) → HPLC Astaxanthin Assay Bag (2,430 s) → Supplement & Aqua Feed Buyers.SUPPLIERFood-Grade CO2& SaltsI0.89 d1Green PhasePhotobioreactorC/T 2,970 sI1.22 d2UV Light-StressCarotenoidC/T 3,690 sI1.00 d3Centrifuge &Bead-Mill CrackC/T 4,815 sI0.50 d4Spray-DryNitrogen InertingC/T 3,240 sI0.39 d5HPLC AstaxanthinAssay BagC/T 2,430 sI0.50 dCUSTOMERSupplement &Aqua Feed…18 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Green Phase Photobioreactor2,970 s12 min95%97.8%916 (0.89 d)25
2. UV Light-Stress Carotenoid3,690 s15 min93%96.8%922 (1.22 d)19
3. Centrifuge & Bead-Mill Crack4,815 s25 min85%94.5%518 (1.00 d)13
4. Spray-Dry Nitrogen Inerting3,240 s6 min96%98.8%49 (0.50 d)23
5. HPLC Astaxanthin Assay Bag2,430 s8 min97%99.4%47 (0.39 d)31

Key figures

Takt time
4,500 s
Lead time
4.71 d
Value-added time
17,145 s
Process cycle efficiency (PCE)
4.5%
Rolled throughput yield (RTY)
87.9%
Customer demand per day
18 batches
Line capacity per day
13 batches
Bottleneck
Centrifuge & Bead-Mill Crack

Reading the bottleneck

The bottleneck is "Centrifuge & Bead-Mill Crack": it can process 13 batches per day against a demand of 18 batches, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 5,994 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 850 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.