Humane Night Modular-Drawer Broiler Harvest Loop
Product family: Zero-Bruise Live Bird Haul.
Flow: 42-Day Grow-Out Farms → Pre-Catch Feed Withdrawal → Dim-Light Module Drawer Load → Ventilated Curtain Truck Haul → Lairage Mist Fan Holding Bay → Controlled-Atmosphere Unload → Primary Processing Plant
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Pre-Catch Feed Withdrawal | 198 s | 12 min | 95% | 97.8% | 90 | 162 (0.90 d) | 247 |
| 2. Dim-Light Module Drawer Load | 246 s | 15 min | 93% | 96.8% | 90 | 216 (1.20 d) | 191 |
| 3. Ventilated Curtain Truck Haul | 321 s | 25 min | 85% | 94.5% | 54 | 180 (1.00 d) | 123 |
| 4. Lairage Mist Fan Holding Bay | 216 s | 6 min | 96% | 98.8% | 36 | 90 (0.50 d) | 229 |
| 5. Controlled-Atmosphere Unload | 162 s | 8 min | 97% | 99.4% | 36 | 72 (0.40 d) | 307 |
Key figures
- Takt time
- 300 s
- Lead time
- 4.52 d
- Value-added time
- 1,143 s
- Process cycle efficiency (PCE)
- 0.47%
- Rolled throughput yield (RTY)
- 87.9%
- Customer demand per day
- 180 crates
- Line capacity per day
- 123 crates
- Bottleneck
- Ventilated Curtain Truck Haul
Reading the bottleneck
The bottleneck is "Ventilated Curtain Truck Haul": it can process 123 crates per day against a demand of 180 crates, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 321 s to 400 s, against a takt of 300 s. The largest loss at this step is equipment downtime (uptime 85%), about 56.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hydroponics, Aquaculture & Livestock Ops: Hydroponics, Aquaculture & Livestock Ops
- Fully Automated LED Indoor Hydroponic Vertical Farm
- Land-Based RAS Recirculating Salmon Smolt Farm
- Automated Rotary & Robotic Milking Parlor
- 30-Ton/Hr Steam-Pelleted Livestock Feed Mill
- Zero-Exchange Biofloc Vannamei Shrimp Harvest
- Centrifugal Raw Monofloral Honey Uncap & Jar
- Automated Grafted Tomato & Pepper Plug Nursery
- Automated In-Ovo Vaccine & Day-Old Chick Hatchery
- Synchronized Forage Harvester & Bunker Compaction
- Tubular Photobioreactor Astaxanthin Algae Harvest
- Tidal Bed Oyster Tumbler Grading & Purification