Zero-Exchange Biofloc Vannamei Shrimp Harvest

Product family: Fresh Antibiotic-Free Prawns.

Flow: SPF Post-Larvae Hatchery → Water Quality & Feed Drone → Live Seine Net Stress-Free → Ice-Slurry Instant Stunning → Metabisulfite Dip & Size Sort → Insulated Fish-Tub Truck → Sushi & Export IQF Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Zero-Exchange Biofloc Vannamei Shrimp HarvestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. SPF Post-Larvae Hatchery → Water Quality & Feed Drone (111 s) → Live Seine Net Stress-Free (138 s) → Ice-Slurry Instant Stunning (181 s) → Metabisulfite Dip & Size Sort (122 s) → Insulated Fish-Tub Truck (91.0 s) → Sushi & Export IQF Plants.SUPPLIERSPF Post-LarvaeHatcheryI0.90 d1Water Quality &Feed DroneC/T 111 sI1.20 d2Live Seine NetStress-FreeC/T 138 sI1.00 d3Ice-SlurryInstant StunningC/T 181 sI0.50 d4Metabisulfite Dip& Size SortC/T 122 sI0.40 d5InsulatedFish-Tub TruckC/T 91.0 sI0.50 dCUSTOMERSushi & ExportIQF Plants320 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Water Quality & Feed Drone111 s12 min95%97.8%160288 (0.90 d)440
2. Live Seine Net Stress-Free138 s15 min93%96.8%160384 (1.20 d)341
3. Ice-Slurry Instant Stunning181 s25 min85%94.5%96320 (1.00 d)217
4. Metabisulfite Dip & Size Sort122 s6 min96%98.8%64160 (0.50 d)406
5. Insulated Fish-Tub Truck91.0 s8 min97%99.4%64128 (0.40 d)547

Key figures

Takt time
169 s
Lead time
4.51 d
Value-added time
643 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
87.9%
Customer demand per day
320 crates
Line capacity per day
217 crates
Bottleneck
Ice-Slurry Instant Stunning

Reading the bottleneck

The bottleneck is "Ice-Slurry Instant Stunning": it can process 217 crates per day against a demand of 320 crates, so it falls short of demand by 32.0%. Once downtime and scrap are counted, its cycle time grows from 181 s to 225 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 85%), about 31.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.