Fully Automated LED Indoor Hydroponic Vertical Farm
Product family: Pesticide-Free Baby Kale & Leaf.
Flow: Seeds, Coco-Peat & Nutrients → Robot Seeding & Dark Germ → 18-Day LED Spectrum Grow → Auto Crane Tower Harvest → Precision Cut & Flowpack Bag → Cold-Van Urban Store Drop → Local Urban Grocers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Robot Seeding & Dark Germ | 5.5 s | 12 min | 95% | 97.8% | 3,250 | 5,850 (0.90 d) | 8,879 |
| 2. 18-Day LED Spectrum Grow | 6.8 s | 15 min | 93% | 96.8% | 3,250 | 7,800 (1.20 d) | 6,911 |
| 3. Auto Crane Tower Harvest | 8.9 s | 25 min | 85% | 94.5% | 1,950 | 6,500 (1.00 d) | 4,422 |
| 4. Precision Cut & Flowpack Bag | 6.0 s | 6 min | 96% | 98.8% | 1,300 | 3,250 (0.50 d) | 8,252 |
| 5. Cold-Van Urban Store Drop | 4.5 s | 8 min | 97% | 99.4% | 1,300 | 2,600 (0.40 d) | 11,056 |
Key figures
- Takt time
- 8.3 s
- Lead time
- 4.50 d
- Value-added time
- 31.7 s
- Process cycle efficiency (PCE)
- 0.013%
- Rolled throughput yield (RTY)
- 87.9%
- Customer demand per day
- 6,500 packs
- Line capacity per day
- 4,422 packs
- Bottleneck
- Auto Crane Tower Harvest
Reading the bottleneck
The bottleneck is "Auto Crane Tower Harvest": it can process 4,422 packs per day against a demand of 6,500 packs, so it falls short of demand by 32.0%. Once downtime and scrap are counted, its cycle time grows from 8.9 s to 11.1 s, against a takt of 8.3 s. The largest loss at this step is equipment downtime (uptime 85%), about 1.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hydroponics, Aquaculture & Livestock Ops: Hydroponics, Aquaculture & Livestock Ops
- Land-Based RAS Recirculating Salmon Smolt Farm
- Automated Rotary & Robotic Milking Parlor
- 30-Ton/Hr Steam-Pelleted Livestock Feed Mill
- Zero-Exchange Biofloc Vannamei Shrimp Harvest
- Centrifugal Raw Monofloral Honey Uncap & Jar
- Automated Grafted Tomato & Pepper Plug Nursery
- Automated In-Ovo Vaccine & Day-Old Chick Hatchery
- Humane Night Modular-Drawer Broiler Harvest Loop
- Synchronized Forage Harvester & Bunker Compaction
- Tubular Photobioreactor Astaxanthin Algae Harvest
- Tidal Bed Oyster Tumbler Grading & Purification