Synchronized Forage Harvester & Bunker Compaction

Product family: High-Density Maize Silage Pit.

Flow: Standing Field Maize Crop → Self-Propelled Kernel Crush → Parallel Tractor Trailer Relay → Layer-by-Layer Clamp Push → Heavy Wheel Tractor Roll Pack → Oxygen-Barrier Silo Seal Film → Dairy & Biogas Digesters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Synchronized Forage Harvester & Bunker CompactionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Standing Field Maize Crop → Self-Propelled Kernel Crush (548 s) → Parallel Tractor Trailer Relay (681 s) → Layer-by-Layer Clamp Push (889 s) → Heavy Wheel Tractor Roll Pack (598 s) → Oxygen-Barrier Silo Seal Film (449 s) → Dairy & Biogas Digesters.SUPPLIERStanding FieldMaize CropI0.91 d1Self-PropelledKernel CrushC/T 548 sI1.20 d2Parallel TractorTrailer RelayC/T 681 sI1.00 d3Layer-by-LayerClamp PushC/T 889 sI0.51 d4Heavy WheelTractor Roll PackC/T 598 sI0.40 d5Oxygen-BarrierSilo Seal FilmC/T 449 sI0.51 dCUSTOMERDairy & BiogasDigesters65 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Self-Propelled Kernel Crush548 s12 min95%97.8%3359 (0.91 d)89
2. Parallel Tractor Trailer Relay681 s15 min93%96.8%3378 (1.20 d)69
3. Layer-by-Layer Clamp Push889 s25 min85%94.5%2065 (1.00 d)44
4. Heavy Wheel Tractor Roll Pack598 s6 min96%98.8%1333 (0.51 d)83
5. Oxygen-Barrier Silo Seal Film449 s8 min97%99.4%1326 (0.40 d)111

Key figures

Takt time
831 s
Lead time
4.58 d
Value-added time
3,165 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
87.9%
Customer demand per day
65 batches
Line capacity per day
44 batches
Bottleneck
Layer-by-Layer Clamp Push

Reading the bottleneck

The bottleneck is "Layer-by-Layer Clamp Push": it can process 44 batches per day against a demand of 65 batches, so it falls short of demand by 31.7%. Once downtime and scrap are counted, its cycle time grows from 889 s to 1,107 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 85%), about 157 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.