Land-Based RAS Recirculating Salmon Smolt Farm
Product family: Bio-Filtered 5kg Harvest Fish.
Flow: Bio-Secure Roe & Feed Suppliers → Drum-Filter & MBBR Bio-Clean → O2 Injection & UV Tank Growth → Optical Biomass Size Grade → Starvation Purge Water Basin → Humane Harvest & Ice Pump → Fresh Fish Processing Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Drum-Filter & MBBR Bio-Clean | 63.0 s | 12 min | 95% | 97.8% | 425 | 765 (0.90 d) | 1,173 |
| 2. O2 Injection & UV Tank Growth | 78.0 s | 15 min | 93% | 96.8% | 425 | 1,020 (1.20 d) | 914 |
| 3. Optical Biomass Size Grade | 102 s | 25 min | 85% | 94.5% | 255 | 850 (1.00 d) | 598 |
| 4. Starvation Purge Water Basin | 69.0 s | 6 min | 96% | 98.8% | 170 | 425 (0.50 d) | 1,089 |
| 5. Humane Harvest & Ice Pump | 51.0 s | 8 min | 97% | 99.4% | 170 | 340 (0.40 d) | 1,486 |
Key figures
- Takt time
- 95.3 s
- Lead time
- 4.50 d
- Value-added time
- 363 s
- Process cycle efficiency (PCE)
- 0.099%
- Rolled throughput yield (RTY)
- 87.9%
- Customer demand per day
- 850 crates
- Line capacity per day
- 598 crates
- Bottleneck
- Optical Biomass Size Grade
Reading the bottleneck
The bottleneck is "Optical Biomass Size Grade": it can process 598 crates per day against a demand of 850 crates, so it falls short of demand by 29.6%. Once downtime and scrap are counted, its cycle time grows from 102 s to 127 s, against a takt of 95.3 s. The largest loss at this step is equipment downtime (uptime 85%), about 18.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hydroponics, Aquaculture & Livestock Ops: Hydroponics, Aquaculture & Livestock Ops
- Fully Automated LED Indoor Hydroponic Vertical Farm
- Automated Rotary & Robotic Milking Parlor
- 30-Ton/Hr Steam-Pelleted Livestock Feed Mill
- Zero-Exchange Biofloc Vannamei Shrimp Harvest
- Centrifugal Raw Monofloral Honey Uncap & Jar
- Automated Grafted Tomato & Pepper Plug Nursery
- Automated In-Ovo Vaccine & Day-Old Chick Hatchery
- Humane Night Modular-Drawer Broiler Harvest Loop
- Synchronized Forage Harvester & Bunker Compaction
- Tubular Photobioreactor Astaxanthin Algae Harvest
- Tidal Bed Oyster Tumbler Grading & Purification