30-Ton/Hr Steam-Pelleted Livestock Feed Mill

Product family: Bio-Secure Medicated-Free Feed.

Flow: Corn, Soymeal & Premix Silos → Batch Weigh & Hammer Grinding → Micro-Dosing Premix Ribbon Mix → 85°C Salmonellosis Condition → Pellet Die Press & Cooler → Compartment Auger Bulk Truck → Partner Farms & Co-ops

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 30-Ton/Hr Steam-Pelleted Livestock Feed MillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Corn, Soymeal & Premix Silos → Batch Weigh & Hammer Grinding (191 s) → Micro-Dosing Premix Ribbon Mix (237 s) → 85°C Salmonellosis Condition (310 s) → Pellet Die Press & Cooler (208 s) → Compartment Auger Bulk Truck (156 s) → Partner Farms & Co-ops.SUPPLIERCorn, Soymeal &Premix SilosI0.90 d1Batch Weigh &Hammer GrindingC/T 191 sI1.20 d2Micro-DosingPremix Ribbon MixC/T 237 sI1.00 d385°CSalmonellosis…C/T 310 sI0.50 d4Pellet Die Press& CoolerC/T 208 sI0.40 d5Compartment AugerBulk TruckC/T 156 sI0.50 dCUSTOMERPartner Farms &Co-ops280 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Batch Weigh & Hammer Grinding191 s12 min95%97.8%140252 (0.90 d)387
2. Micro-Dosing Premix Ribbon Mix237 s15 min93%96.8%140336 (1.20 d)301
3. 85°C Salmonellosis Condition310 s25 min85%94.5%84280 (1.00 d)197
4. Pellet Die Press & Cooler208 s6 min96%98.8%56140 (0.50 d)361
5. Compartment Auger Bulk Truck156 s8 min97%99.4%56112 (0.40 d)486

Key figures

Takt time
289 s
Lead time
4.51 d
Value-added time
1,102 s
Process cycle efficiency (PCE)
0.30%
Rolled throughput yield (RTY)
87.9%
Customer demand per day
280 tonnes
Line capacity per day
197 tonnes
Bottleneck
85°C Salmonellosis Condition

Reading the bottleneck

The bottleneck is "85°C Salmonellosis Condition": it can process 197 tonnes per day against a demand of 280 tonnes, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 310 s to 386 s, against a takt of 289 s. The largest loss at this step is equipment downtime (uptime 85%), about 54.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hydroponics, Aquaculture & Livestock Ops: Hydroponics, Aquaculture & Livestock Ops