Agri-Food Harvest & Export Packhouses VSM Scenarios
12 scenarios of Agri-Food Harvest & Export Packhouses, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Field Bin Receipt & Drench → Fungicide Wash, Wax & Dry → Optical Sizer & Brix Grading → Carton Fill & Forced-Air Precool → Phyto Cert & Reefer Container. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Fresh Produce Optical Grading & Export Pack | 1,800 crates per day | 2 | 30.0 s | 4.90 d | 0.044% | Optical Sizer & Brix Grading |
| Hass Avocado Hydro-Cool & Dry-Matter Export | 2,400 crates per day | 2 | 22.5 s | 4.90 d | 0.033% | NIR Dry-Matter Density Sort |
| Glasshouse Truss Tomato Optical Color & Pack | 3,600 packs per day | 2 | 15.0 s | 4.90 d | 0.022% | NIR Color-Stage Sort Line |
| Soft-Touch Air-Cushion Blueberry Clamshell Line | 9,500 packs per day | 2 | 5.7 s | 4.90 d | 0.008% | Optical Soft-Berry/Color Kick |
| Optical Defect Wash, Size & Net-Bag Potato Line | 4,800 packs per day | 2 | 11.3 s | 4.90 d | 0.016% | 360° Optical Blemish Grader |
| Medjool Date Ultrasonic Mist & Window Box Line | 3,200 packs per day | 2 | 16.9 s | 4.90 d | 0.025% | NIR Loose-Skin & Weight Sizer |
| Triple-Wash Ready-to-Eat Baby Spinach Pillow Bag | 14,000 packs per day | 2 | 3.9 s | 4.90 d | 0.006% | Spin Centrifuge Dry Tunnel |
| Laser & X-Ray Almond Hulling, Shelling & Pack | 42 tonnes per day | 2 | 1,286 s | 4.97 d | 1.9% | Laser Color & Chip Optical |
| Controlled-Atmosphere (CA) Apple Defect Line | 1,600 crates per day | 2 | 33.8 s | 4.90 d | 0.049% | Internal Browning NIR Scanner |
| Living & Cut Fresh Herb Sleeve & Clamshell Line | 8,500 packs per day | 1 | 3.2 s | 4.90 d | 0.009% | Perforated Conical Flow Sleeve |
| 2-Hr Field-to-Cooler Strawberry Punnet Line | 11,000 packs per day | 1 | 2.5 s | 4.90 d | 0.007% | 60-Min Forced-Air Tunnel to 2°C |
| Sulfur-Pad Export Seedless Table Grape Pack | 2,800 crates per day | 2 | 19.3 s | 4.90 d | 0.028% | 500g Hinged Clamshell Weigh |