Optical Defect Wash, Size & Net-Bag Potato Line
Product family: 2.5kg Retail Mesh-Bag Potatoes.
Flow: Cold-Store Farm Silos → De-Stoner Hydro Flume Wash → Brush Polisher & Air Knife Dry → 360° Optical Blemish Grader → Multi-Head Weighing Vertical → Automated Bale & Box Pallet → Supermarket Produce Aisles
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. De-Stoner Hydro Flume Wash | 7.2 s | 15 min | 94% | 97.8% | 2,400 | 3,840 (0.80 d) | 6,665 |
| 2. Brush Polisher & Air Knife Dry | 8.8 s | 12 min | 93% | 98.4% | 1,920 | 3,360 (0.70 d) | 5,428 |
| 3. 360° Optical Blemish Grader | 12.0 s | 28 min | 84% | 93.0% | 2,880 | 5,760 (1.20 d) | 3,333 |
| 4. Multi-Head Weighing Vertical | 9.2 s | 10 min | 93% | 98.4% | 1,440 | 4,320 (0.90 d) | 5,172 |
| 5. Automated Bale & Box Pallet | 6.3 s | 8 min | 97% | 99.2% | 1,440 | 2,880 (0.60 d) | 8,003 |
Key figures
- Takt time
- 11.3 s
- Lead time
- 4.90 d
- Value-added time
- 43.5 s
- Process cycle efficiency (PCE)
- 0.016%
- Rolled throughput yield (RTY)
- 87.4%
- Customer demand per day
- 4,800 packs
- Line capacity per day
- 3,333 packs
- Bottleneck
- 360° Optical Blemish Grader
Reading the bottleneck
The bottleneck is "360° Optical Blemish Grader": it can process 3,333 packs per day against a demand of 4,800 packs, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 12.0 s to 15.4 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 2.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Agri-Food Harvest & Export Packhouses: Agri-Food Harvest & Export Packhouses
- Fresh Produce Optical Grading & Export Pack
- Hass Avocado Hydro-Cool & Dry-Matter Export
- Glasshouse Truss Tomato Optical Color & Pack
- Soft-Touch Air-Cushion Blueberry Clamshell Line
- Medjool Date Ultrasonic Mist & Window Box Line
- Triple-Wash Ready-to-Eat Baby Spinach Pillow Bag
- Laser & X-Ray Almond Hulling, Shelling & Pack
- Controlled-Atmosphere (CA) Apple Defect Line
- Living & Cut Fresh Herb Sleeve & Clamshell Line
- 2-Hr Field-to-Cooler Strawberry Punnet Line
- Sulfur-Pad Export Seedless Table Grape Pack