Glasshouse Truss Tomato Optical Color & Pack

Product family: 500g Flowpack Vine Trays.

Flow: Hydroponic Greenhouses → Gentle Greenhouse Cart In → Manual Stem-Up Orientation → NIR Color-Stage Sort Line → Checkweigh Pulp Punnet Fill → Breathable Perforated Wrap → National Supermarkets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Glasshouse Truss Tomato Optical Color & PackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hydroponic Greenhouses → Gentle Greenhouse Cart In (9.6 s) → Manual Stem-Up Orientation (11.7 s) → NIR Color-Stage Sort Line (16.1 s) → Checkweigh Pulp Punnet Fill (12.3 s) → Breathable Perforated Wrap (8.4 s) → National Supermarkets.SUPPLIERHydroponicGreenhousesI0.80 d1Gentle GreenhouseCart InC/T 9.6 sI0.70 d2Manual Stem-UpOrientationC/T 11.7 sI1.20 d3NIR Color-StageSort LineC/T 16.1 sI0.90 d4Checkweigh PulpPunnet FillC/T 12.3 sI0.60 d5BreathablePerforated WrapC/T 8.4 sI0.70 dCUSTOMERNationalSupermarkets3,600 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Gentle Greenhouse Cart In9.6 s15 min94%97.8%1,8002,880 (0.80 d)4,999
2. Manual Stem-Up Orientation11.7 s12 min93%98.4%1,4402,520 (0.70 d)4,083
3. NIR Color-Stage Sort Line16.1 s28 min84%93.0%2,1604,320 (1.20 d)2,484
4. Checkweigh Pulp Punnet Fill12.3 s10 min93%98.4%1,0803,240 (0.90 d)3,869
5. Breathable Perforated Wrap8.4 s8 min97%99.2%1,0802,160 (0.60 d)6,003

Key figures

Takt time
15.0 s
Lead time
4.90 d
Value-added time
58.1 s
Process cycle efficiency (PCE)
0.022%
Rolled throughput yield (RTY)
87.4%
Customer demand per day
3,600 packs
Line capacity per day
2,484 packs
Bottleneck
NIR Color-Stage Sort Line

Reading the bottleneck

The bottleneck is "NIR Color-Stage Sort Line": it can process 2,484 packs per day against a demand of 3,600 packs, so it falls short of demand by 31.0%. Once downtime and scrap are counted, its cycle time grows from 16.1 s to 20.6 s, against a takt of 15.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 3.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Agri-Food Harvest & Export Packhouses: Agri-Food Harvest & Export Packhouses