Living & Cut Fresh Herb Sleeve & Clamshell Line

Product family: 25g Basil & Coriander Sleeves.

Flow: Hydroponic Glasshouses → Cool Misty Ambient Staging → Semi-Auto Bundle & Weigh → Perforated Conical Flow Sleeve → Trace Sticker & Date Print → 10°C Ethylene-Free Dispatch → Grocery Refrigerated Herbs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Living & Cut Fresh Herb Sleeve & Clamshell LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hydroponic Glasshouses → Cool Misty Ambient Staging (2.0 s) → Semi-Auto Bundle & Weigh (2.5 s) → Perforated Conical Flow Sleeve (3.4 s) → Trace Sticker & Date Print (2.6 s) → 10°C Ethylene-Free Dispatch (1.8 s) → Grocery Refrigerated Herbs.SUPPLIERHydroponicGlasshousesI0.80 d1Cool MistyAmbient StagingC/T 2.0 sI0.70 d2Semi-Auto Bundle& WeighC/T 2.5 sI1.20 d3PerforatedConical Flow…C/T 3.4 sI0.90 d4Trace Sticker &Date PrintC/T 2.6 sI0.60 d510°CEthylene-Free…C/T 1.8 sI0.70 dCUSTOMERGroceryRefrigerated…8,500 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cool Misty Ambient Staging2.0 s15 min94%97.8%4,2506,800 (0.80 d)11,583
2. Semi-Auto Bundle & Weigh2.5 s12 min93%98.4%3,4005,950 (0.70 d)9,224
3. Perforated Conical Flow Sleeve3.4 s28 min84%93.0%5,10010,200 (1.20 d)5,560
4. Trace Sticker & Date Print2.6 s10 min93%98.4%2,5507,650 (0.90 d)8,799
5. 10°C Ethylene-Free Dispatch1.8 s8 min97%99.2%2,5505,100 (0.60 d)13,578

Key figures

Takt time
3.2 s
Lead time
4.90 d
Value-added time
12.3 s
Process cycle efficiency (PCE)
0.009%
Rolled throughput yield (RTY)
87.4%
Customer demand per day
8,500 packs
Line capacity per day
5,560 packs
Bottleneck
Perforated Conical Flow Sleeve

Reading the bottleneck

The bottleneck is "Perforated Conical Flow Sleeve": it can process 5,560 packs per day against a demand of 8,500 packs, so it falls short of demand by 34.6%. Once downtime and scrap are counted, its cycle time grows from 3.4 s to 4.4 s, against a takt of 3.2 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Agri-Food Harvest & Export Packhouses: Agri-Food Harvest & Export Packhouses