Sulfur-Pad Export Seedless Table Grape Pack

Product family: 4.5kg Clamshell Punnet Cartons.

Flow: Trellis Vineyard Pickers → Shaded Vineyard Lug Intake → Cold Trimming & Decay Cull → 500g Hinged Clamshell Weigh → SO2 Slow-Release Pad Insert → Forced-Air Cool & Reefer → UK / EU Retailers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sulfur-Pad Export Seedless Table Grape PackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Trellis Vineyard Pickers → Shaded Vineyard Lug Intake (12.3 s) → Cold Trimming & Decay Cull (15.0 s) → 500g Hinged Clamshell Weigh (20.6 s) → SO2 Slow-Release Pad Insert (15.8 s) → Forced-Air Cool & Reefer (10.8 s) → UK / EU Retailers.SUPPLIERTrellisVineyardPickersI0.80 d1Shaded VineyardLug IntakeC/T 12.3 sI0.70 d2Cold Trimming &Decay CullC/T 15.0 sI1.20 d3500g HingedClamshell WeighC/T 20.6 sI0.90 d4SO2 Slow-ReleasePad InsertC/T 15.8 sI0.60 d5Forced-Air Cool &ReeferC/T 10.8 sI0.70 dCUSTOMERUK / EURetailers2,800 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Shaded Vineyard Lug Intake12.3 s15 min94%97.8%1,4002,240 (0.80 d)3,902
2. Cold Trimming & Decay Cull15.0 s12 min93%98.4%1,1201,960 (0.70 d)3,185
3. 500g Hinged Clamshell Weigh20.6 s28 min84%93.0%1,6803,360 (1.20 d)1,942
4. SO2 Slow-Release Pad Insert15.8 s10 min93%98.4%8402,520 (0.90 d)3,012
5. Forced-Air Cool & Reefer10.8 s8 min97%99.2%8401,680 (0.60 d)4,669

Key figures

Takt time
19.3 s
Lead time
4.90 d
Value-added time
74.5 s
Process cycle efficiency (PCE)
0.028%
Rolled throughput yield (RTY)
87.4%
Customer demand per day
2,800 crates
Line capacity per day
1,942 crates
Bottleneck
500g Hinged Clamshell Weigh

Reading the bottleneck

The bottleneck is "500g Hinged Clamshell Weigh": it can process 1,942 crates per day against a demand of 2,800 crates, so it falls short of demand by 30.7%. Once downtime and scrap are counted, its cycle time grows from 20.6 s to 26.4 s, against a takt of 19.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 3.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.