Triple-Wash Ready-to-Eat Baby Spinach Pillow Bag

Product family: 150g Nitrogen MAP Leaf Bags.

Flow: Baby-Leaf Contract Farms → Cooler Vacuum Pull & Foreign Kick → 3-Stage Ozone Ice-Water Flume → Spin Centrifuge Dry Tunnel → High-Speed Multi-Head VFFS → O2-Controlled Breathable Film → Chilled Produce Shelves

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Triple-Wash Ready-to-Eat Baby Spinach Pillow BagSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Baby-Leaf Contract Farms → Cooler Vacuum Pull & Foreign Kick (2.5 s) → 3-Stage Ozone Ice-Water Flume (3.0 s) → Spin Centrifuge Dry Tunnel (4.1 s) → High-Speed Multi-Head VFFS (3.2 s) → O2-Controlled Breathable Film (2.2 s) → Chilled Produce Shelves.SUPPLIERBaby-LeafContract FarmsI0.80 d1Cooler VacuumPull & Foreign…C/T 2.5 sI0.70 d23-Stage OzoneIce-Water FlumeC/T 3.0 sI1.20 d3Spin CentrifugeDry TunnelC/T 4.1 sI0.90 d4High-SpeedMulti-Head VFFSC/T 3.2 sI0.60 d5O2-ControlledBreathable FilmC/T 2.2 sI0.70 dCUSTOMERChilled ProduceShelves14,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cooler Vacuum Pull & Foreign Kick2.5 s15 min94%97.8%7,00011,200 (0.80 d)19,195
2. 3-Stage Ozone Ice-Water Flume3.0 s12 min93%98.4%5,6009,800 (0.70 d)15,923
3. Spin Centrifuge Dry Tunnel4.1 s28 min84%93.0%8,40016,800 (1.20 d)9,755
4. High-Speed Multi-Head VFFS3.2 s10 min93%98.4%4,20012,600 (0.90 d)14,871
5. O2-Controlled Breathable Film2.2 s8 min97%99.2%4,2008,400 (0.60 d)22,919

Key figures

Takt time
3.9 s
Lead time
4.90 d
Value-added time
15.0 s
Process cycle efficiency (PCE)
0.006%
Rolled throughput yield (RTY)
87.4%
Customer demand per day
14,000 packs
Line capacity per day
9,755 packs
Bottleneck
Spin Centrifuge Dry Tunnel

Reading the bottleneck

The bottleneck is "Spin Centrifuge Dry Tunnel": it can process 9,755 packs per day against a demand of 14,000 packs, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 4.1 s to 5.2 s, against a takt of 3.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.