2-Hr Field-to-Cooler Strawberry Punnet Line

Product family: Zero-Touch Direct Pack Line.

Flow: High-Tunnel Berry Pickers → Shadow Field Pallet Collect → Checkweigh & Vision Top-Scan → 60-Min Forced-Air Tunnel to 2°C → Top-Seal Clear Breathable Film → Chilled Overnight Trunking → Same-Night Retail DCs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 2-Hr Field-to-Cooler Strawberry Punnet LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. High-Tunnel Berry Pickers → Shadow Field Pallet Collect (1.6 s) → Checkweigh & Vision Top-Scan (1.9 s) → 60-Min Forced-Air Tunnel to 2°C (2.6 s) → Top-Seal Clear Breathable Film (2.0 s) → Chilled Overnight Trunking (1.4 s) → Same-Night Retail DCs.SUPPLIERHigh-TunnelBerry PickersI0.80 d1Shadow FieldPallet CollectC/T 1.6 sI0.70 d2Checkweigh &Vision Top-ScanC/T 1.9 sI1.20 d360-Min Forced-AirTunnel to 2°CC/T 2.6 sI0.90 d4Top-Seal ClearBreathable FilmC/T 2.0 sI0.60 d5Chilled OvernightTrunkingC/T 1.4 sI0.70 dCUSTOMERSame-NightRetail DCs11,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Shadow Field Pallet Collect1.6 s15 min94%97.8%5,5008,800 (0.80 d)14,479
2. Checkweigh & Vision Top-Scan1.9 s12 min93%98.4%4,4007,700 (0.70 d)12,137
3. 60-Min Forced-Air Tunnel to 2°C2.6 s28 min84%93.0%6,60013,200 (1.20 d)7,271
4. Top-Seal Clear Breathable Film2.0 s10 min93%98.4%3,3009,900 (0.90 d)11,439
5. Chilled Overnight Trunking1.4 s8 min97%99.2%3,3006,600 (0.60 d)17,458

Key figures

Takt time
2.5 s
Lead time
4.90 d
Value-added time
9.5 s
Process cycle efficiency (PCE)
0.007%
Rolled throughput yield (RTY)
87.4%
Customer demand per day
11,000 packs
Line capacity per day
7,271 packs
Bottleneck
60-Min Forced-Air Tunnel to 2°C

Reading the bottleneck

The bottleneck is "60-Min Forced-Air Tunnel to 2°C": it can process 7,271 packs per day against a demand of 11,000 packs, so it falls short of demand by 33.9%. Once downtime and scrap are counted, its cycle time grows from 2.6 s to 3.3 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.