Aftermarket & Remanufacturing VSM Scenarios
12 scenarios of Aftermarket & Remanufacturing, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Core Grading & Disassembly → Ultrasonic Clean & Blast → Reconditioning & Rewind → 100% Endurance Bench Test → Box Labeling & Distributor Pack. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Remanufactured 180A Smart Alternator Line | 720 units per day | 2 | 75.0 s | 10.4 d | 0.052% | Slip-Ring, Bearing & Regulator |
| VNT Remanufactured Passenger Turbocharger | 480 units per day | 2 | 113 s | 10.4 d | 0.078% | New Bearing & Seal Fit |
| Heavy Fleet Cold-Cure Pre-Molded Tire Retread | 650 units per day | 2 | 83.1 s | 10.4 d | 0.057% | Extrude Cushion & Tread Band |
| Diamond-Cut Flow-Formed Alloy Wheel Line | 1,400 parts per day | 3 | 57.9 s | 10.4 d | 0.027% | X-Ray Pore Check & T6 Heat |
| Copper-Free Ceramic Disc Brake Pad Press | 4,200 packs per day | 2 | 12.9 s | 10.4 d | 0.009% | 300°C Scorching Plate Bake |
| Gas-Pressurized Monotube Shock Absorber | 2,400 parts per day | 2 | 22.5 s | 10.4 d | 0.016% | Valve Shim Stack Clean Room |
| Heavy-Duty Aluminum Radiator Brazing Line | 580 units per day | 2 | 93.1 s | 10.4 d | 0.064% | CAB Flux Brazing Tunnel |
| End-of-Life Catalytic Converter PGM Recovery | 950 units per day | 2 | 56.8 s | 10.4 d | 0.039% | Rotary Blending & XRF Assay |
| AGM Start-Stop Lead-Acid Battery Plant | 3,200 units per day | 3 | 25.3 s | 10.4 d | 0.012% | Cast-On-Strap & Poly Case Weld |
| ARG Aftermarket Replacement Windshield Cell | 750 parts per day | 2 | 72.0 s | 10.4 d | 0.050% | Press-Bend Roller Furnace |
| Heavy Commercial Manual Transmission Rebuild | 28 units per day | 1 | 964 s | 10.5 d | 1.3% | Synchro Cone & Bearing Match |
| Spin-On Engine Oil Filter High-Speed Line | 14,000 units per day | 3 | 5.8 s | 10.4 d | 0.003% | Drawn Can Roll & Anti-Drain |