Heavy Commercial Manual Transmission Rebuild

Product family: 16-Speed Fleet Gearbox Reman.

Flow: Fleet Maintenance Yards → Hot-Jet Strip & Wash → Gear Tooth Mag-Particle Check → Synchro Cone & Bearing Match → Laser Shaft Shimming Stack → Loaded Noise & Shift Dyno → Trucking Operators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Heavy Commercial Manual Transmission RebuildSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Fleet Maintenance Yards → Hot-Jet Strip & Wash (694 s) → Gear Tooth Mag-Particle Check (752 s) → Synchro Cone & Bearing Match (1,041 s) → Laser Shaft Shimming Stack (714 s) → Loaded Noise & Shift Dyno (540 s) → Trucking Operators.SUPPLIERFleetMaintenanceYardsI2.39 d1Hot-Jet Strip &WashC/T 694 sI1.79 d2Gear ToothMag-Particle…C/T 752 sI2.11 d3Synchro Cone &Bearing MatchC/T 1,041 sI1.00 d4Laser ShaftShimming StackC/T 714 sI0.89 d5Loaded Noise &Shift DynoC/T 540 sI2.21 dCUSTOMERTruckingOperators28 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Hot-Jet Strip & Wash694 s15 min94%92.5%2867 (2.39 d)33
2. Gear Tooth Mag-Particle Check752 s20 min92%97.6%2850 (1.79 d)31
3. Synchro Cone & Bearing Match1,041 s30 min85%94.2%2259 (2.11 d)19
4. Laser Shaft Shimming Stack714 s12 min94%98.4%1128 (1.00 d)33
5. Loaded Noise & Shift Dyno540 s8 min97%99.4%1425 (0.89 d)46

Key figures

Takt time
964 s
Lead time
10.5 d
Value-added time
3,741 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
28 units
Line capacity per day
19 units
Bottleneck
Synchro Cone & Bearing Match

Reading the bottleneck

The bottleneck is "Synchro Cone & Bearing Match": it can process 19 units per day against a demand of 28 units, so it falls short of demand by 32.1%. Once downtime and scrap are counted, its cycle time grows from 1,041 s to 1,300 s, against a takt of 964 s. The largest loss at this step is equipment downtime (uptime 85%), about 184 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.