Heavy-Duty Aluminum Radiator Brazing Line

Product family: Replacement Engine Radiators.

Flow: Aluminum strip supplier → High-Speed Louvered Fin Roll → Automated Core Tube Builder → CAB Flux Brazing Tunnel → PA66 Nylon Tank Crimp Tab → 2.5-Bar Underwater Decay Test → Aftermarket Cooling Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Heavy-Duty Aluminum Radiator Brazing LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aluminum strip supplier → High-Speed Louvered Fin Roll (67.0 s) → Automated Core Tube Builder (73.0 s) → CAB Flux Brazing Tunnel (101 s) → PA66 Nylon Tank Crimp Tab (69.0 s) → 2.5-Bar Underwater Decay Test (52.0 s) → Aftermarket Cooling Hubs.SUPPLIERAluminum stripsupplierI2.40 d1High-SpeedLouvered Fin RollC/T 67.0 sI1.80 d2Automated CoreTube BuilderC/T 73.0 sI2.10 d3CAB Flux BrazingTunnelC/T 101 sI1.00 d4PA66 Nylon TankCrimp TabC/T 69.0 sI0.90 d52.5-BarUnderwater Decay…C/T 52.0 sI2.20 dCUSTOMERAftermarketCooling Hubs580 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. High-Speed Louvered Fin Roll67.0 s15 min94%92.5%5801,392 (2.40 d)689
2. Automated Core Tube Builder73.0 s20 min92%97.6%5801,044 (1.80 d)649
3. CAB Flux Brazing Tunnel101 s30 min85%94.2%4641,218 (2.10 d)410
4. PA66 Nylon Tank Crimp Tab69.0 s12 min94%98.4%232580 (1.00 d)700
5. 2.5-Bar Underwater Decay Test52.0 s8 min97%99.4%290522 (0.90 d)983

Key figures

Takt time
93.1 s
Lead time
10.4 d
Value-added time
362 s
Process cycle efficiency (PCE)
0.064%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
580 units
Line capacity per day
410 units
Bottleneck
CAB Flux Brazing Tunnel

Reading the bottleneck

The bottleneck is "CAB Flux Brazing Tunnel": it can process 410 units per day against a demand of 580 units, so it falls short of demand by 29.3%. Once downtime and scrap are counted, its cycle time grows from 101 s to 126 s, against a takt of 93.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 17.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Aftermarket & Remanufacturing: Aftermarket & Remanufacturing