Gas-Pressurized Monotube Shock Absorber

Product family: Adaptive Damping Struts.

Flow: Precision tube supplier → Chrome Rod Induction Grind → Tube Seam & End-Cap Form → Valve Shim Stack Clean Room → N2 Gas Charge & Crimp Seal → 100% Force-Velocity Dyno → Tier-1 & Aftermarket

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Gas-Pressurized Monotube Shock AbsorberSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Precision tube supplier → Chrome Rod Induction Grind (16.2 s) → Tube Seam & End-Cap Form (17.6 s) → Valve Shim Stack Clean Room (24.3 s) → N2 Gas Charge & Crimp Seal (16.6 s) → 100% Force-Velocity Dyno (12.6 s) → Tier-1 & Aftermarket.SUPPLIERPrecision tubesupplierI2.40 d1Chrome RodInduction GrindC/T 16.2 sI1.80 d2Tube Seam &End-Cap FormC/T 17.6 sI2.10 d3Valve Shim StackClean RoomC/T 24.3 sI1.00 d4N2 Gas Charge &Crimp SealC/T 16.6 sI0.90 d5100%Force-Velocity…C/T 12.6 sI2.20 dCUSTOMERTier-1 &Aftermarket2,400 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Chrome Rod Induction Grind16.2 s15 min94%92.5%2,4005,760 (2.40 d)2,850
2. Tube Seam & End-Cap Form17.6 s20 min92%97.6%2,4004,320 (1.80 d)2,694
3. Valve Shim Stack Clean Room24.3 s30 min85%94.2%1,9205,040 (2.10 d)1,705
4. N2 Gas Charge & Crimp Seal16.6 s12 min94%98.4%9602,400 (1.00 d)2,909
5. 100% Force-Velocity Dyno12.6 s8 min97%99.4%1,2002,160 (0.90 d)4,059

Key figures

Takt time
22.5 s
Lead time
10.4 d
Value-added time
87.3 s
Process cycle efficiency (PCE)
0.016%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
2,400 parts
Line capacity per day
1,705 parts
Bottleneck
Valve Shim Stack Clean Room

Reading the bottleneck

The bottleneck is "Valve Shim Stack Clean Room": it can process 1,705 parts per day against a demand of 2,400 parts, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 24.3 s to 30.3 s, against a takt of 22.5 s. The largest loss at this step is equipment downtime (uptime 85%), about 4.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.