VNT Remanufactured Passenger Turbocharger
Product family: Balanced CHRA Core Cartridges.
Flow: IAM Core Logistics → Turbine Hot-Side Blasting → Precision Shaft Journal Polish → New Bearing & Seal Fit → High-Speed VSR Balancer → Flow-Bench Actuator Set → Regional parts warehouses
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Turbine Hot-Side Blasting | 81.0 s | 15 min | 94% | 92.5% | 480 | 1,152 (2.40 d) | 570 |
| 2. Precision Shaft Journal Polish | 88.0 s | 20 min | 92% | 97.6% | 480 | 864 (1.80 d) | 539 |
| 3. New Bearing & Seal Fit | 122 s | 30 min | 85% | 94.2% | 384 | 1,008 (2.10 d) | 340 |
| 4. High-Speed VSR Balancer | 83.0 s | 12 min | 94% | 98.4% | 192 | 480 (1.00 d) | 582 |
| 5. Flow-Bench Actuator Set | 63.0 s | 8 min | 97% | 99.4% | 240 | 432 (0.90 d) | 812 |
Key figures
- Takt time
- 113 s
- Lead time
- 10.4 d
- Value-added time
- 437 s
- Process cycle efficiency (PCE)
- 0.078%
- Rolled throughput yield (RTY)
- 83.2%
- Customer demand per day
- 480 units
- Line capacity per day
- 340 units
- Bottleneck
- New Bearing & Seal Fit
Reading the bottleneck
The bottleneck is "New Bearing & Seal Fit": it can process 340 units per day against a demand of 480 units, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 122 s to 152 s, against a takt of 113 s. The largest loss at this step is equipment downtime (uptime 85%), about 21.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Aftermarket & Remanufacturing: Aftermarket & Remanufacturing
- Remanufactured 180A Smart Alternator Line
- Heavy Fleet Cold-Cure Pre-Molded Tire Retread
- Diamond-Cut Flow-Formed Alloy Wheel Line
- Copper-Free Ceramic Disc Brake Pad Press
- Gas-Pressurized Monotube Shock Absorber
- Heavy-Duty Aluminum Radiator Brazing Line
- End-of-Life Catalytic Converter PGM Recovery
- AGM Start-Stop Lead-Acid Battery Plant
- ARG Aftermarket Replacement Windshield Cell
- Heavy Commercial Manual Transmission Rebuild
- Spin-On Engine Oil Filter High-Speed Line