Spin-On Engine Oil Filter High-Speed Line

Product family: Synthetic Pleated Filter Cans.

Flow: Filter media supplier → Media Knife-Pleat & Cure → Plastic/Steel Spiral Tube Insert → Drawn Can Roll & Anti-Drain → Double-Seam Baseplate Spin → Helium Burst & Cartoning → Aftermarket filter distributors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Spin-On Engine Oil Filter High-Speed LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Filter media supplier → Media Knife-Pleat & Cure (4.2 s) → Plastic/Steel Spiral Tube Insert (4.5 s) → Drawn Can Roll & Anti-Drain (6.2 s) → Double-Seam Baseplate Spin (4.3 s) → Helium Burst & Cartoning (3.2 s) → Aftermarket filter distributors.SUPPLIERFilter mediasupplierI2.40 d1Media Knife-Pleat& CureC/T 4.2 sI1.80 d2Plastic/SteelSpiral Tube…C/T 4.5 sI2.10 d3Drawn Can Roll &Anti-DrainC/T 6.2 sI1.00 d4Double-SeamBaseplate SpinC/T 4.3 sI0.90 d5Helium Burst &CartoningC/T 3.2 sI2.20 dCUSTOMERAftermarketfilter…14,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Media Knife-Pleat & Cure4.2 s15 min94%92.5%14,00033,600 (2.40 d)16,583
2. Plastic/Steel Spiral Tube Insert4.5 s20 min92%97.6%14,00025,200 (1.80 d)15,923
3. Drawn Can Roll & Anti-Drain6.2 s30 min85%94.2%11,20029,400 (2.10 d)10,170
4. Double-Seam Baseplate Spin4.3 s12 min94%98.4%5,60014,000 (1.00 d)17,036
5. Helium Burst & Cartoning3.2 s8 min97%99.4%7,00012,600 (0.90 d)24,117

Key figures

Takt time
5.8 s
Lead time
10.4 d
Value-added time
22.4 s
Process cycle efficiency (PCE)
0.003%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
14,000 units
Line capacity per day
10,170 units
Bottleneck
Drawn Can Roll & Anti-Drain

Reading the bottleneck

The bottleneck is "Drawn Can Roll & Anti-Drain": it can process 10,170 units per day against a demand of 14,000 units, so it falls short of demand by 27.4%. Once downtime and scrap are counted, its cycle time grows from 6.2 s to 7.7 s, against a takt of 5.8 s. The largest loss at this step is equipment downtime (uptime 85%), about 1.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.