Remanufactured 180A Smart Alternator Line

Product family: Zero-Mile OEM Core Alternators.

Flow: Dealer Core Pools → Core ID & Teardown Bench → Glass-Bead Blast & Bake → Slip-Ring, Bearing & Regulator → Varnish Dip & Rotor Balance → Load Ripples Dyno Printout → European IAM Distributors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Remanufactured 180A Smart Alternator LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Dealer Core Pools → Core ID & Teardown Bench (54.0 s) → Glass-Bead Blast & Bake (59.0 s) → Slip-Ring, Bearing & Regulator (81.0 s) → Varnish Dip & Rotor Balance (56.0 s) → Load Ripples Dyno Printout (42.0 s) → European IAM Distributors.SUPPLIERDealer CorePoolsI2.40 d1Core ID &Teardown BenchC/T 54.0 sI1.80 d2Glass-Bead Blast& BakeC/T 59.0 sI2.10 d3Slip-Ring,Bearing &…C/T 81.0 sI1.00 d4Varnish Dip &Rotor BalanceC/T 56.0 sI0.90 d5Load Ripples DynoPrintoutC/T 42.0 sI2.20 dCUSTOMEREuropean IAMDistributors720 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Core ID & Teardown Bench54.0 s15 min94%92.5%7201,728 (2.40 d)855
2. Glass-Bead Blast & Bake59.0 s20 min92%97.6%7201,296 (1.80 d)804
3. Slip-Ring, Bearing & Regulator81.0 s30 min85%94.2%5761,512 (2.10 d)512
4. Varnish Dip & Rotor Balance56.0 s12 min94%98.4%288720 (1.00 d)862
5. Load Ripples Dyno Printout42.0 s8 min97%99.4%360648 (0.90 d)1,218

Key figures

Takt time
75.0 s
Lead time
10.4 d
Value-added time
292 s
Process cycle efficiency (PCE)
0.052%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
720 units
Line capacity per day
512 units
Bottleneck
Slip-Ring, Bearing & Regulator

Reading the bottleneck

The bottleneck is "Slip-Ring, Bearing & Regulator": it can process 512 units per day against a demand of 720 units, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 81.0 s to 101 s, against a takt of 75.0 s. The largest loss at this step is equipment downtime (uptime 85%), about 14.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.