Powertrain & Driveline VSM Scenarios
12 scenarios of Powertrain & Driveline, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Rough Forging & Casting → CNC Precision Transfer → Heat Treat & Grinding → Sub-Assembly & Torque → Dyno NVH & Cold Test. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Aluminum V6 Engine Block CNC Line | 420 parts per day | 2 | 129 s | 8.81 d | 0.11% | Honing & Bore Plateau |
| 8-Speed Automatic Transmission Assembly | 680 units per day | 2 | 79.4 s | 8.81 d | 0.066% | Valve Body Solenoid Test |
| Variable Geometry Turbocharger Cell | 1,100 units per day | 2 | 49.1 s | 8.80 d | 0.041% | 220,000 RPM Core Balance |
| EV Hairpin Stator & Traction Motor Line | 540 units per day | 2 | 100 s | 8.81 d | 0.084% | Laser Hairpin Weld & Varnish |
| SiC Dual-Sided EV Traction Inverter | 750 units per day | 2 | 72.0 s | 8.81 d | 0.060% | Die-Level HV Test & Pot |
| Integrated 3-in-1 E-Axle Drive Unit | 480 units per day | 2 | 113 s | 8.81 d | 0.094% | Motor-Reducer Marriage |
| Aluminum Monoblock Brake Caliper Line | 1,600 parts per day | 2 | 33.8 s | 8.80 d | 0.028% | Anodize & Ceramic Coat |
| Dual-Pinion Electric Power Steering | 950 units per day | 2 | 56.8 s | 8.80 d | 0.048% | Pinion & Torque Sensor Zero |
| Constant Velocity Half-Shaft & Joint | 2,200 parts per day | 3 | 36.8 s | 8.80 d | 0.021% | Ball Cage Match & Grease |
| Euro-7 Catalytic & SCR Aftertreatment | 820 units per day | 2 | 65.9 s | 8.80 d | 0.055% | Dual-Head Seam TIG Weld |
| EV High-Voltage Scroll A/C Compressor | 1,350 units per day | 2 | 40.0 s | 8.80 d | 0.033% | HV Hermetic Motor Shrink |
| GDI High-Pressure Fuel Injector 350bar | 4,800 parts per day | 3 | 16.9 s | 8.80 d | 0.009% | Piezo Stack Pre-Load Calib |