GDI High-Pressure Fuel Injector 350bar

Product family: Direct-Injection Piezo Valves.

Flow: Precision stainless tube supplier → Nozzle EDM Micro-Drill → Laser Micro-Weld Solenoid → Piezo Stack Pre-Load Calib → Dynamic Flow Laser Trim → 350-Bar Helium Decay Test → Hybrid Engine Programs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: GDI High-Pressure Fuel Injector 350barSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Precision stainless tube supplier → Nozzle EDM Micro-Drill (11.5 s) → Laser Micro-Weld Solenoid (14.2 s) → Piezo Stack Pre-Load Calib (17.9 s) → Dynamic Flow Laser Trim (13.2 s) → 350-Bar Helium Decay Test (10.5 s) → Hybrid Engine Programs.SUPPLIERPrecisionstainless tubesupplierI1.80 d1Nozzle EDMMicro-DrillC/T 11.5 sI1.40 d2Laser Micro-WeldSolenoidC/T 14.2 sI2.20 d3Piezo StackPre-Load CalibC/T 17.9 sI1.10 d4Dynamic FlowLaser TrimC/T 13.2 sI0.80 d5350-Bar HeliumDecay TestC/T 10.5 sI1.50 dCUSTOMERHybrid EnginePrograms4,800 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Nozzle EDM Micro-Drill11.5 s45 min94%98.6%7,2008,640 (1.80 d)6,383
2. Laser Micro-Weld Solenoid14.2 s38 min91%97.8%4,8006,720 (1.40 d)4,934
3. Piezo Stack Pre-Load Calib17.9 s65 min84%95.8%7,20010,560 (2.20 d)3,525
4. Dynamic Flow Laser Trim13.2 s15 min94%98.4%2,4005,280 (1.10 d)5,550
5. 350-Bar Helium Decay Test10.5 s10 min96%99.1%1,2003,840 (0.80 d)7,122

Key figures

Takt time
16.9 s
Lead time
8.80 d
Value-added time
67.3 s
Process cycle efficiency (PCE)
0.009%
Rolled throughput yield (RTY)
90.1%
Customer demand per day
4,800 parts
Line capacity per day
3,525 parts
Bottleneck
Piezo Stack Pre-Load Calib

Reading the bottleneck

The bottleneck is "Piezo Stack Pre-Load Calib": it can process 3,525 parts per day against a demand of 4,800 parts, so it falls short of demand by 26.6%. Once downtime and scrap are counted, its cycle time grows from 17.9 s to 22.2 s, against a takt of 16.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 3.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.