Dual-Pinion Electric Power Steering

Product family: EPS Steering Gear Racks.

Flow: Steering sensor supplier → Rack Teeth Broach & Hob → Induction Harden & Straighten → Pinion & Torque Sensor Zero → ECU Brushless Motor Mate → End-Stop Rack Force Dyno → OEM Chassis Final Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dual-Pinion Electric Power SteeringSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Steering sensor supplier → Rack Teeth Broach & Hob (38.7 s) → Induction Harden & Straighten (48.0 s) → Pinion & Torque Sensor Zero (60.0 s) → ECU Brushless Motor Mate (44.0 s) → End-Stop Rack Force Dyno (35.2 s) → OEM Chassis Final Line.SUPPLIERSteering sensorsupplierI1.80 d1Rack Teeth Broach& HobC/T 38.7 sI1.40 d2Induction Harden& StraightenC/T 48.0 sI2.20 d3Pinion & TorqueSensor ZeroC/T 60.0 sI1.10 d4ECU BrushlessMotor MateC/T 44.0 sI0.80 d5End-Stop RackForce DynoC/T 35.2 sI1.50 dCUSTOMEROEM ChassisFinal Line950 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Rack Teeth Broach & Hob38.7 s45 min94%98.6%1,4251,710 (1.80 d)1,250
2. Induction Harden & Straighten48.0 s38 min91%97.8%9501,330 (1.40 d)959
3. Pinion & Torque Sensor Zero60.0 s65 min84%95.8%1,4252,090 (2.20 d)689
4. ECU Brushless Motor Mate44.0 s15 min94%98.4%4751,045 (1.10 d)1,097
5. End-Stop Rack Force Dyno35.2 s10 min96%99.1%238760 (0.80 d)1,395

Key figures

Takt time
56.8 s
Lead time
8.80 d
Value-added time
226 s
Process cycle efficiency (PCE)
0.048%
Rolled throughput yield (RTY)
90.1%
Customer demand per day
950 units
Line capacity per day
689 units
Bottleneck
Pinion & Torque Sensor Zero

Reading the bottleneck

The bottleneck is "Pinion & Torque Sensor Zero": it can process 689 units per day against a demand of 950 units, so it falls short of demand by 27.4%. Once downtime and scrap are counted, its cycle time grows from 60.0 s to 74.6 s, against a takt of 56.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 11.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.