Variable Geometry Turbocharger Cell

Product family: VGT Diesel/Hybrid Turbos.

Flow: Turbo housing foundry → Shaft Friction Weld → Compressor 5-Axis Mill → 220,000 RPM Core Balance → VGT Actuator Calibrate → Hot Gas Flow Audit → European Engine Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Variable Geometry Turbocharger CellSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Turbo housing foundry → Shaft Friction Weld (33.4 s) → Compressor 5-Axis Mill (41.0 s) → 220,000 RPM Core Balance (52.0 s) → VGT Actuator Calibrate (38.3 s) → Hot Gas Flow Audit (30.4 s) → European Engine Plants.SUPPLIERTurbo housingfoundryI1.80 d1Shaft FrictionWeldC/T 33.4 sI1.40 d2Compressor 5-AxisMillC/T 41.0 sI2.20 d3220,000 RPM CoreBalanceC/T 52.0 sI1.10 d4VGT ActuatorCalibrateC/T 38.3 sI0.80 d5Hot Gas FlowAuditC/T 30.4 sI1.50 dCUSTOMEREuropean EnginePlants1,100 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Shaft Friction Weld33.4 s45 min94%98.6%1,6501,980 (1.80 d)1,449
2. Compressor 5-Axis Mill41.0 s38 min91%97.8%1,1001,540 (1.40 d)1,123
3. 220,000 RPM Core Balance52.0 s65 min84%95.8%1,6502,420 (2.20 d)795
4. VGT Actuator Calibrate38.3 s15 min94%98.4%5501,210 (1.10 d)1,261
5. Hot Gas Flow Audit30.4 s10 min96%99.1%275880 (0.80 d)1,615

Key figures

Takt time
49.1 s
Lead time
8.80 d
Value-added time
195 s
Process cycle efficiency (PCE)
0.041%
Rolled throughput yield (RTY)
90.1%
Customer demand per day
1,100 units
Line capacity per day
795 units
Bottleneck
220,000 RPM Core Balance

Reading the bottleneck

The bottleneck is "220,000 RPM Core Balance": it can process 795 units per day against a demand of 1,100 units, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 52.0 s to 64.6 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 9.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.