Aluminum Monoblock Brake Caliper Line

Product family: 4-Piston Performance Calipers.

Flow: Brake-caliper foundry → Blank Shot-Blast & Clamp → Twin-Spindle Bore CNC → Anodize & Ceramic Coat → Piston Seal & Dust Boot → Hydraulic Pressure Impulse → Tier-1 Corner Modules

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Aluminum Monoblock Brake Caliper LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Brake-caliper foundry → Blank Shot-Blast & Clamp (23.0 s) → Twin-Spindle Bore CNC (28.3 s) → Anodize & Ceramic Coat (35.8 s) → Piston Seal & Dust Boot (26.3 s) → Hydraulic Pressure Impulse (20.9 s) → Tier-1 Corner Modules.SUPPLIERBrake-caliperfoundryI1.80 d1Blank Shot-Blast& ClampC/T 23.0 sI1.40 d2Twin-Spindle BoreCNCC/T 28.3 sI2.20 d3Anodize & CeramicCoatC/T 35.8 sI1.10 d4Piston Seal &Dust BootC/T 26.3 sI0.80 d5HydraulicPressure ImpulseC/T 20.9 sI1.50 dCUSTOMERTier-1 CornerModules1,600 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Blank Shot-Blast & Clamp23.0 s45 min94%98.6%2,4002,880 (1.80 d)2,104
2. Twin-Spindle Bore CNC28.3 s38 min91%97.8%1,6002,240 (1.40 d)1,626
3. Anodize & Ceramic Coat35.8 s65 min84%95.8%2,4003,520 (2.20 d)1,155
4. Piston Seal & Dust Boot26.3 s15 min94%98.4%8001,760 (1.10 d)1,836
5. Hydraulic Pressure Impulse20.9 s10 min96%99.1%4001,280 (0.80 d)2,349

Key figures

Takt time
33.8 s
Lead time
8.80 d
Value-added time
134 s
Process cycle efficiency (PCE)
0.028%
Rolled throughput yield (RTY)
90.1%
Customer demand per day
1,600 parts
Line capacity per day
1,155 parts
Bottleneck
Anodize & Ceramic Coat

Reading the bottleneck

The bottleneck is "Anodize & Ceramic Coat": it can process 1,155 parts per day against a demand of 1,600 parts, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 35.8 s to 44.5 s, against a takt of 33.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 6.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.