EV High-Voltage Scroll A/C Compressor

Product family: 800V Heat-Pump Compressors.

Flow: Compressor die-cast supplier → Orbiting Scroll CNC Grind → Anodize & Clearance Match → HV Hermetic Motor Shrink → Clean Assembly & Oil Charge → Helium Leak & Pump Run-In → EV Thermal Systems OEM

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EV High-Voltage Scroll A/C CompressorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Compressor die-cast supplier → Orbiting Scroll CNC Grind (27.2 s) → Anodize & Clearance Match (33.6 s) → HV Hermetic Motor Shrink (42.0 s) → Clean Assembly & Oil Charge (31.2 s) → Helium Leak & Pump Run-In (24.8 s) → EV Thermal Systems OEM.SUPPLIERCompressordie-castsupplierI1.80 d1Orbiting ScrollCNC GrindC/T 27.2 sI1.40 d2Anodize &Clearance MatchC/T 33.6 sI2.20 d3HV Hermetic MotorShrinkC/T 42.0 sI1.10 d4Clean Assembly &Oil ChargeC/T 31.2 sI0.80 d5Helium Leak &Pump Run-InC/T 24.8 sI1.50 dCUSTOMEREV ThermalSystems OEM1,350 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Orbiting Scroll CNC Grind27.2 s45 min94%98.6%2,0252,430 (1.80 d)1,779
2. Anodize & Clearance Match33.6 s38 min91%97.8%1,3501,890 (1.40 d)1,370
3. HV Hermetic Motor Shrink42.0 s65 min84%95.8%2,0252,970 (2.20 d)985
4. Clean Assembly & Oil Charge31.2 s15 min94%98.4%6751,485 (1.10 d)1,548
5. Helium Leak & Pump Run-In24.8 s10 min96%99.1%3381,080 (0.80 d)1,980

Key figures

Takt time
40.0 s
Lead time
8.80 d
Value-added time
159 s
Process cycle efficiency (PCE)
0.033%
Rolled throughput yield (RTY)
90.1%
Customer demand per day
1,350 units
Line capacity per day
985 units
Bottleneck
HV Hermetic Motor Shrink

Reading the bottleneck

The bottleneck is "HV Hermetic Motor Shrink": it can process 985 units per day against a demand of 1,350 units, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 42.0 s to 52.2 s, against a takt of 40.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 8.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Powertrain & Driveline: Powertrain & Driveline