BIW Stamping & Electromechanical VSM Scenarios
12 scenarios of BIW Stamping & Electromechanical, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Stamping Press → Robotic Welding → Surface Coating → Final Assembly → EOL Functional Test. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Automotive Electromechanical Assembly | 920 modules per day | 2 | 58.7 s | 10.0 d | 0.046% | Final Assembly |
| BIW Aluminum Door Shell & Hemming | 1,100 parts per day | 2 | 49.1 s | 10.0 d | 0.038% | Robotic Laser Brazing |
| Boron Steel Hot-Stamped B-Pillar | 1,400 parts per day | 3 | 57.9 s | 10.0 d | 0.030% | Shot-Blast Scale Clean |
| EV Extruded Aluminum Battery Enclosure | 360 units per day | 2 | 150 s | 10.0 d | 0.12% | He-Leak & Pressure Decay |
| Hydroformed Sub-Frame Suspension Cradle | 640 parts per day | 2 | 84.4 s | 10.0 d | 0.066% | KTL Cathodic Dip E-Coat |
| Class-A Aluminum Hood Outer & Inner | 880 parts per day | 2 | 61.4 s | 10.0 d | 0.048% | Tabletop Hemming Press |
| High-Pressure Rear Underbody Megacasting | 280 parts per day | 3 | 289 s | 10.0 d | 0.15% | T5 Heat Oven & X-Ray |
| Roll-Formed Martensitic Bumper Beam | 1,800 parts per day | 3 | 45.0 s | 10.0 d | 0.024% | Zinc-Nickel Barrel Plating |
| 6-Layer Co-Extruded HDPE Fuel Tank | 1,050 units per day | 3 | 77.1 s | 10.0 d | 0.040% | In-Tank Pump Hot-Plate Weld |
| Panoramic Glass Sunroof Frame Module | 720 units per day | 2 | 75.0 s | 10.0 d | 0.059% | Acoustic Pinch-Guard Zero |
| Automotive Wiper Drive & Linkage Assembly | 2,600 units per day | 2 | 20.8 s | 10.0 d | 0.016% | Zero-Park Angle Calibrate |
| Smart Power-Cinched Automotive Door Latch | 3,800 parts per day | 3 | 21.3 s | 10.0 d | 0.011% | Robotic Grease & Rivet |