Panoramic Glass Sunroof Frame Module
Product family: Dual-Pane Tilt Roof Assemblies.
Flow: Sunroof steel & EPDM supplier → Rail Roll-Form & Bend → Injection Encapsulation Mold → Cable Track & Motor Fit → Acoustic Pinch-Guard Zero → Monsoon Water Spray Booth → OEM General Assembly Roof
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Rail Roll-Form & Bend | 51.0 s | 75 min | 88% | 98.5% | 1,440 | 1,728 (2.40 d) | 880 |
| 2. Injection Encapsulation Mold | 63.0 s | 35 min | 90% | 97.4% | 576 | 1,296 (1.80 d) | 715 |
| 3. Cable Track & Motor Fit | 68.0 s | 40 min | 91% | 97.9% | 720 | 1,368 (1.90 d) | 676 |
| 4. Acoustic Pinch-Guard Zero | 81.0 s | 18 min | 86% | 95.8% | 216 | 1,152 (1.60 d) | 513 |
| 5. Monsoon Water Spray Booth | 54.0 s | 12 min | 95% | 98.9% | 108 | 576 (0.80 d) | 856 |
Key figures
- Takt time
- 75.0 s
- Lead time
- 10.0 d
- Value-added time
- 317 s
- Process cycle efficiency (PCE)
- 0.059%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 720 units
- Line capacity per day
- 513 units
- Bottleneck
- Acoustic Pinch-Guard Zero
Reading the bottleneck
The bottleneck is "Acoustic Pinch-Guard Zero": it can process 513 units per day against a demand of 720 units, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 81.0 s to 98.3 s, against a takt of 75.0 s. The largest loss at this step is equipment downtime (uptime 86%), about 13.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of BIW Stamping & Electromechanical: BIW Stamping & Electromechanical
- Automotive Electromechanical Assembly
- BIW Aluminum Door Shell & Hemming
- Boron Steel Hot-Stamped B-Pillar
- EV Extruded Aluminum Battery Enclosure
- Hydroformed Sub-Frame Suspension Cradle
- Class-A Aluminum Hood Outer & Inner
- High-Pressure Rear Underbody Megacasting
- Roll-Formed Martensitic Bumper Beam
- 6-Layer Co-Extruded HDPE Fuel Tank
- Automotive Wiper Drive & Linkage Assembly
- Smart Power-Cinched Automotive Door Latch