Boron Steel Hot-Stamped B-Pillar

Product family: 1500 MPa Press-Hardened Pillars.

Flow: Press-hardening steel supplier → 930°C Roller Hearth Heat → Water-Cooled Die Quench → 5-Axis 3D Fiber Laser Trim → Shot-Blast Scale Clean → Destructive Bend & Laser Gauging → Crash Structure Body Shop

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Boron Steel Hot-Stamped B-PillarSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Press-hardening steel supplier → 930°C Roller Hearth Heat (39.3 s) → Water-Cooled Die Quench (49.0 s) → 5-Axis 3D Fiber Laser Trim (52.0 s) → Shot-Blast Scale Clean (62.0 s) → Destructive Bend & Laser Gauging (42.0 s) → Crash Structure Body Shop.SUPPLIERPress-hardeningsteel supplierI2.40 d1930°C RollerHearth HeatC/T 39.3 sI1.80 d2Water-Cooled DieQuenchC/T 49.0 sI1.90 d35-Axis 3D FiberLaser TrimC/T 52.0 sI1.60 d4Shot-Blast ScaleCleanC/T 62.0 sI0.80 d5Destructive Bend& Laser GaugingC/T 42.0 sI1.50 dCUSTOMERCrash StructureBody Shop1,400 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 930°C Roller Hearth Heat39.3 s75 min88%98.5%2,8003,360 (2.40 d)1,737
2. Water-Cooled Die Quench49.0 s35 min90%97.4%1,1202,520 (1.80 d)1,402
3. 5-Axis 3D Fiber Laser Trim52.0 s40 min91%97.9%1,4002,660 (1.90 d)1,347
4. Shot-Blast Scale Clean62.0 s18 min86%95.8%4202,240 (1.60 d)1,029
5. Destructive Bend & Laser Gauging42.0 s12 min95%98.9%2101,120 (0.80 d)1,705

Key figures

Takt time
57.9 s
Lead time
10.0 d
Value-added time
244 s
Process cycle efficiency (PCE)
0.030%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
1,400 parts
Line capacity per day
1,029 parts
Bottleneck
Shot-Blast Scale Clean

Reading the bottleneck

The bottleneck is "Shot-Blast Scale Clean": it can process 1,029 parts per day against a demand of 1,400 parts, so it falls short of demand by 26.5%. Once downtime and scrap are counted, its cycle time grows from 62.0 s to 75.3 s, against a takt of 57.9 s. The largest loss at this step is equipment downtime (uptime 86%), about 10.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of BIW Stamping & Electromechanical: BIW Stamping & Electromechanical