Class-A Aluminum Hood Outer & Inner

Product family: Pedestrian-Safe Engine Hoods.

Flow: Aluminum rolled-products mill → Laser Blank Feed & Lube → Servo Transfer Press Line → Clinched Hinge & Foam Bond → Tabletop Hemming Press → High-Gloss Zebra Light Inspect → OEM Paint & Body Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Class-A Aluminum Hood Outer & InnerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aluminum rolled-products mill → Laser Blank Feed & Lube (42.0 s) → Servo Transfer Press Line (52.0 s) → Clinched Hinge & Foam Bond (55.0 s) → Tabletop Hemming Press (66.0 s) → High-Gloss Zebra Light Inspect (44.0 s) → OEM Paint & Body Line.SUPPLIERAluminumrolled-productsmillI2.40 d1Laser Blank Feed& LubeC/T 42.0 sI1.80 d2Servo TransferPress LineC/T 52.0 sI1.90 d3Clinched Hinge &Foam BondC/T 55.0 sI1.60 d4Tabletop HemmingPressC/T 66.0 sI0.80 d5High-Gloss ZebraLight InspectC/T 44.0 sI1.50 dCUSTOMEROEM Paint &Body Line880 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Blank Feed & Lube42.0 s75 min88%98.5%1,7602,112 (2.40 d)1,068
2. Servo Transfer Press Line52.0 s35 min90%97.4%7041,584 (1.80 d)866
3. Clinched Hinge & Foam Bond55.0 s40 min91%97.9%8801,672 (1.90 d)836
4. Tabletop Hemming Press66.0 s18 min86%95.8%2641,408 (1.60 d)629
5. High-Gloss Zebra Light Inspect44.0 s12 min95%98.9%132704 (0.80 d)1,051

Key figures

Takt time
61.4 s
Lead time
10.0 d
Value-added time
259 s
Process cycle efficiency (PCE)
0.048%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
880 parts
Line capacity per day
629 parts
Bottleneck
Tabletop Hemming Press

Reading the bottleneck

The bottleneck is "Tabletop Hemming Press": it can process 629 parts per day against a demand of 880 parts, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 66.0 s to 80.1 s, against a takt of 61.4 s. The largest loss at this step is equipment downtime (uptime 86%), about 10.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.