Automotive Wiper Drive & Linkage Assembly

Product family: Dual-Motor Wiper Systems.

Flow: Motor & die-cast supplier → Die-Cast Frame De-Flash → Crank Ball-Stud Rivet → Brushless Motor Clip & Bolt → Zero-Park Angle Calibrate → Wet Glass Friction Endurance → Front Cowl Sub-Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automotive Wiper Drive & Linkage AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Motor & die-cast supplier → Die-Cast Frame De-Flash (14.1 s) → Crank Ball-Stud Rivet (17.4 s) → Brushless Motor Clip & Bolt (18.7 s) → Zero-Park Angle Calibrate (22.4 s) → Wet Glass Friction Endurance (15.0 s) → Front Cowl Sub-Assembly.SUPPLIERMotor &die-castsupplierI2.40 d1Die-Cast FrameDe-FlashC/T 14.1 sI1.80 d2Crank Ball-StudRivetC/T 17.4 sI1.90 d3Brushless MotorClip & BoltC/T 18.7 sI1.60 d4Zero-Park AngleCalibrateC/T 22.4 sI0.80 d5Wet GlassFriction…C/T 15.0 sI1.50 dCUSTOMERFront CowlSub-Assembly2,600 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Die-Cast Frame De-Flash14.1 s75 min88%98.5%5,2006,240 (2.40 d)3,181
2. Crank Ball-Stud Rivet17.4 s35 min90%97.4%2,0804,680 (1.80 d)2,588
3. Brushless Motor Clip & Bolt18.7 s40 min91%97.9%2,6004,940 (1.90 d)2,458
4. Zero-Park Angle Calibrate22.4 s18 min86%95.8%7804,160 (1.60 d)1,854
5. Wet Glass Friction Endurance15.0 s12 min95%98.9%3902,080 (0.80 d)3,082

Key figures

Takt time
20.8 s
Lead time
10.0 d
Value-added time
87.6 s
Process cycle efficiency (PCE)
0.016%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
2,600 units
Line capacity per day
1,854 units
Bottleneck
Zero-Park Angle Calibrate

Reading the bottleneck

The bottleneck is "Zero-Park Angle Calibrate": it can process 1,854 units per day against a demand of 2,600 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 22.4 s to 27.2 s, against a takt of 20.8 s. The largest loss at this step is equipment downtime (uptime 86%), about 3.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.