BIW Aluminum Door Shell & Hemming

Product family: Frameless Aluminum Side Doors.

Flow: Aluminum sheet coil mill → Coil Blanking & Wash → 2500T Tandem Stamping → Roller Hem & Structural Glue → Robotic Laser Brazing → Blue-Light Gap Scan QC → Body-in-White Assembly Shop

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: BIW Aluminum Door Shell & HemmingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aluminum sheet coil mill → Coil Blanking & Wash (33.4 s) → 2500T Tandem Stamping (41.0 s) → Roller Hem & Structural Glue (44.0 s) → Robotic Laser Brazing (53.0 s) → Blue-Light Gap Scan QC (35.3 s) → Body-in-White Assembly Shop.SUPPLIERAluminum sheetcoil millI2.40 d1Coil Blanking &WashC/T 33.4 sI1.80 d22500T TandemStampingC/T 41.0 sI1.90 d3Roller Hem &Structural GlueC/T 44.0 sI1.60 d4Robotic LaserBrazingC/T 53.0 sI0.80 d5Blue-Light GapScan QCC/T 35.3 sI1.50 dCUSTOMERBody-in-WhiteAssembly Shop1,100 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Coil Blanking & Wash33.4 s75 min88%98.5%2,2002,640 (2.40 d)1,343
2. 2500T Tandem Stamping41.0 s35 min90%97.4%8801,980 (1.80 d)1,098
3. Roller Hem & Structural Glue44.0 s40 min91%97.9%1,1002,090 (1.90 d)1,045
4. Robotic Laser Brazing53.0 s18 min86%95.8%3301,760 (1.60 d)783
5. Blue-Light Gap Scan QC35.3 s12 min95%98.9%165880 (0.80 d)1,310

Key figures

Takt time
49.1 s
Lead time
10.0 d
Value-added time
207 s
Process cycle efficiency (PCE)
0.038%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
1,100 parts
Line capacity per day
783 parts
Bottleneck
Robotic Laser Brazing

Reading the bottleneck

The bottleneck is "Robotic Laser Brazing": it can process 783 parts per day against a demand of 1,100 parts, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 53.0 s to 64.3 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 86%), about 8.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of BIW Stamping & Electromechanical: BIW Stamping & Electromechanical