High-Pressure Rear Underbody Megacasting

Product family: One-Piece Al Megacastings.

Flow: Secondary aluminum ingot supplier → 8000T Die-Cast Shot → Spray Quench & Trim Press → Dual-Arm Robotic Dewing → T5 Heat Oven & X-Ray → Gantry 5-Axis Datum Mill → BEV General Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Pressure Rear Underbody MegacastingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Secondary aluminum ingot supplier → 8000T Die-Cast Shot (197 s) → Spray Quench & Trim Press (243 s) → Dual-Arm Robotic Dewing (260 s) → T5 Heat Oven & X-Ray (312 s) → Gantry 5-Axis Datum Mill (208 s) → BEV General Assembly.SUPPLIERSecondaryaluminum ingotsupplierI2.40 d18000T Die-CastShotC/T 197 sI1.80 d2Spray Quench &Trim PressC/T 243 sI1.90 d3Dual-Arm RoboticDewingC/T 260 sI1.60 d4T5 Heat Oven &X-RayC/T 312 sI0.80 d5Gantry 5-AxisDatum MillC/T 208 sI1.50 dCUSTOMERBEV GeneralAssembly280 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 8000T Die-Cast Shot197 s75 min88%98.5%560672 (2.40 d)347
2. Spray Quench & Trim Press243 s35 min90%97.4%224504 (1.80 d)283
3. Dual-Arm Robotic Dewing260 s40 min91%97.9%280532 (1.90 d)269
4. T5 Heat Oven & X-Ray312 s18 min86%95.8%84448 (1.60 d)204
5. Gantry 5-Axis Datum Mill208 s12 min95%98.9%42224 (0.80 d)344

Key figures

Takt time
289 s
Lead time
10.0 d
Value-added time
1,220 s
Process cycle efficiency (PCE)
0.15%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
280 parts
Line capacity per day
204 parts
Bottleneck
T5 Heat Oven & X-Ray

Reading the bottleneck

The bottleneck is "T5 Heat Oven & X-Ray": it can process 204 parts per day against a demand of 280 parts, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 312 s to 379 s, against a takt of 289 s. The largest loss at this step is equipment downtime (uptime 86%), about 50.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.