Glass, Ceramics & Mineral Wool VSM Scenarios
12 scenarios of Glass, Ceramics & Mineral Wool, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Batch House Silica & Cullet Mix → 1550°C Regenerative Furnace → Kiln / Autoclave / Temper Draw → CNC Edge Seam & Laser Scan → A-Frame Rack & Stillage Pack. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 700-Ton/Day Tin-Bath Architectural Float Glass | 680 tonnes per day | 3 | 119 s | 9.61 d | 0.061% | Annealing Lehr Stress Relief |
| Low-E Solar-Control Tempered Facade Glass | 1,400 parts per day | 3 | 57.9 s | 9.60 d | 0.030% | Convection Furnace 680°C Quench |
| 120x240cm Large-Format Porcelain Slab Press | 8,500 parts per day | 3 | 9.5 s | 9.60 d | 0.005% | 12-Bar Digital Inkjet Glaze |
| High-Pressure Cast Vitreous China Toilet Bowl | 950 parts per day | 2 | 56.8 s | 9.60 d | 0.044% | Auto Glaze Spray Booth |
| Borosilicate 5.1 Neutral Pharma Glass Tube Draw | 42 tonnes per day | 3 | 1,929 s | 9.69 d | 0.98% | Laser OD/Wall Closed-Loop |
| Recycled-Glass Fiberglass Insulation Batt Line | 110 tonnes per day | 3 | 736 s | 9.64 d | 0.38% | Formaldehyde-Free Resin Cure |
| Triple-Glazed Argon-Filled Warm-Edge IGU Unit | 1,600 units per day | 2 | 33.8 s | 9.60 d | 0.026% | Argon Gas-Press Dual Assemble |
| 99.8% Isostatic Technical Alumina Ceramics | 480 parts per day | 2 | 113 s | 9.61 d | 0.087% | 1750°C Gas Sinter Shrinkage |
| 2.0mm Patterned Anti-Reflective Solar PV Glass | 4,500 parts per day | 3 | 18.0 s | 9.60 d | 0.009% | Silica-Sol Roller AR Coating |
| Lead-Free Titanium Crystal Stemware Blowing | 18,000 units per day | 3 | 4.5 s | 9.60 d | 0.002% | Laser Rim Crack-Off & Fire Polish |
| 1550°C Basalt Rockwool Fire-Barrier Slab Line | 140 tonnes per day | 3 | 579 s | 9.63 d | 0.30% | Pendulum Fleece & Crimping |
| IS 10-Section Amber Beer/Pharma Glass Container | 180,000 units per day | 3 | 0.5 s | 9.60 d | 0.001% | Tin Hot-End & Annealing Lehr |