Lead-Free Titanium Crystal Stemware Blowing

Product family: 24-Arm Turret Wine Glasses.

Flow: Potassium Silicate Quartz → 1520°C Electric Pot Melter → Blow-and-Pull Stem Forming → Laser Rim Crack-Off & Fire Polish → Annealing Stress Polariscope → 6-Pack Display Box & Drop → HORECA & Retail Dining

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Lead-Free Titanium Crystal Stemware BlowingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Potassium Silicate Quartz → 1520°C Electric Pot Melter (3.1 s) → Blow-and-Pull Stem Forming (3.9 s) → Laser Rim Crack-Off & Fire Polish (4.8 s) → Annealing Stress Polariscope (3.5 s) → 6-Pack Display Box & Drop (2.7 s) → HORECA & Retail Dining.SUPPLIERPotassiumSilicate QuartzI1.60 d11520°C ElectricPot MelterC/T 3.1 sI1.40 d2Blow-and-PullStem FormingC/T 3.9 sI2.20 d3Laser RimCrack-Off & Fire…C/T 4.8 sI1.30 d4Annealing StressPolariscopeC/T 3.5 sI1.10 d56-Pack DisplayBox & DropC/T 2.7 sI2.00 dCUSTOMERHORECA & RetailDining18,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 1520°C Electric Pot Melter3.1 s20 min96%99.1%27,00028,800 (1.60 d)24,613
2. Blow-and-Pull Stem Forming3.9 s40 min95%97.6%27,00025,200 (1.40 d)18,877
3. Laser Rim Crack-Off & Fire Polish4.8 s45 min84%94.8%18,00039,600 (2.20 d)12,990
4. Annealing Stress Polariscope3.5 s20 min92%97.8%10,80023,400 (1.30 d)20,309
5. 6-Pack Display Box & Drop2.7 s10 min97%99.2%9,00019,800 (1.10 d)28,440

Key figures

Takt time
4.5 s
Lead time
9.60 d
Value-added time
18.0 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
18,000 units
Line capacity per day
12,990 units
Bottleneck
Laser Rim Crack-Off & Fire Polish

Reading the bottleneck

The bottleneck is "Laser Rim Crack-Off & Fire Polish": it can process 12,990 units per day against a demand of 18,000 units, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 4.8 s to 6.0 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.