Recycled-Glass Fiberglass Insulation Batt Line
Product family: λ=0.032 Thermal Acoustic Rolls.
Flow: 80% Recycled Window Cullet → Electric Melter Furnace 1450°C → High-RPM Spinner Fiberize → Formaldehyde-Free Resin Cure → High-Compression Roll Slitter → 5:1 Vacuum Multi-Pack Compress → Building Insulation Merchants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Electric Melter Furnace 1450°C | 501 s | 20 min | 96% | 99.1% | 165 | 176 (1.60 d) | 152 |
| 2. High-RPM Spinner Fiberize | 633 s | 40 min | 95% | 97.6% | 165 | 154 (1.40 d) | 116 |
| 3. Formaldehyde-Free Resin Cure | 788 s | 45 min | 84% | 94.8% | 110 | 242 (2.20 d) | 79 |
| 4. High-Compression Roll Slitter | 574 s | 20 min | 92% | 97.8% | 66 | 143 (1.30 d) | 124 |
| 5. 5:1 Vacuum Multi-Pack Compress | 442 s | 10 min | 97% | 99.2% | 55 | 121 (1.10 d) | 174 |
Key figures
- Takt time
- 736 s
- Lead time
- 9.64 d
- Value-added time
- 2,938 s
- Process cycle efficiency (PCE)
- 0.38%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 110 tonnes
- Line capacity per day
- 79 tonnes
- Bottleneck
- Formaldehyde-Free Resin Cure
Reading the bottleneck
The bottleneck is "Formaldehyde-Free Resin Cure": it can process 79 tonnes per day against a demand of 110 tonnes, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 788 s to 990 s, against a takt of 736 s. The largest loss at this step is equipment downtime (uptime 84%), about 150 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Glass, Ceramics & Mineral Wool: Glass, Ceramics & Mineral Wool
- 700-Ton/Day Tin-Bath Architectural Float Glass
- Low-E Solar-Control Tempered Facade Glass
- 120x240cm Large-Format Porcelain Slab Press
- High-Pressure Cast Vitreous China Toilet Bowl
- Borosilicate 5.1 Neutral Pharma Glass Tube Draw
- Triple-Glazed Argon-Filled Warm-Edge IGU Unit
- 99.8% Isostatic Technical Alumina Ceramics
- 2.0mm Patterned Anti-Reflective Solar PV Glass
- Lead-Free Titanium Crystal Stemware Blowing
- 1550°C Basalt Rockwool Fire-Barrier Slab Line
- IS 10-Section Amber Beer/Pharma Glass Container