700-Ton/Day Tin-Bath Architectural Float Glass

Product family: Jumbo PLF 6x3.2m Sheets.

Flow: High-Purity Silica Mines → Silo Batch Weigh & Furnace → Molten Tin Bath 1050°C Float → Annealing Lehr Stress Relief → Laser Optical Ribbon Scan → Auto Snap & Jumbo A-Frame → Commercial Glaziers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 700-Ton/Day Tin-Bath Architectural Float GlassSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. High-Purity Silica Mines → Silo Batch Weigh & Furnace (81.0 s) → Molten Tin Bath 1050°C Float (102 s) → Annealing Lehr Stress Relief (127 s) → Laser Optical Ribbon Scan (93.0 s) → Auto Snap & Jumbo A-Frame (71.0 s) → Commercial Glaziers.SUPPLIERHigh-PuritySilica MinesI1.60 d1Silo Batch Weigh& FurnaceC/T 81.0 sI1.40 d2Molten Tin Bath1050°C FloatC/T 102 sI2.20 d3Annealing LehrStress ReliefC/T 127 sI1.30 d4Laser OpticalRibbon ScanC/T 93.0 sI1.10 d5Auto Snap & JumboA-FrameC/T 71.0 sI2.00 dCUSTOMERCommercialGlaziers680 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Silo Batch Weigh & Furnace81.0 s20 min96%99.1%1,0201,088 (1.60 d)942
2. Molten Tin Bath 1050°C Float102 s40 min95%97.6%1,020952 (1.40 d)722
3. Annealing Lehr Stress Relief127 s45 min84%94.8%6801,496 (2.20 d)491
4. Laser Optical Ribbon Scan93.0 s20 min92%97.8%408884 (1.30 d)764
5. Auto Snap & Jumbo A-Frame71.0 s10 min97%99.2%340748 (1.10 d)1,082

Key figures

Takt time
119 s
Lead time
9.61 d
Value-added time
474 s
Process cycle efficiency (PCE)
0.061%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
680 tonnes
Line capacity per day
491 tonnes
Bottleneck
Annealing Lehr Stress Relief

Reading the bottleneck

The bottleneck is "Annealing Lehr Stress Relief": it can process 491 tonnes per day against a demand of 680 tonnes, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 127 s to 159 s, against a takt of 119 s. The largest loss at this step is equipment downtime (uptime 84%), about 24.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.