1550°C Basalt Rockwool Fire-Barrier Slab Line

Product family: A1 Non-Combustible Stone Wool.

Flow: Basalt Quarry & Steel Slag → Coke/Electric Cupola Melt → 4-Wheel Cascade Fiber Spin → Pendulum Fleece & Crimping → Phenolic Curing Oven 240°C → Saw Trim & Hood Shrink Pack → Cladding & Marine Fire Doors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1550°C Basalt Rockwool Fire-Barrier Slab LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Basalt Quarry & Steel Slag → Coke/Electric Cupola Melt (393 s) → 4-Wheel Cascade Fiber Spin (498 s) → Pendulum Fleece & Crimping (619 s) → Phenolic Curing Oven 240°C (451 s) → Saw Trim & Hood Shrink Pack (347 s) → Cladding & Marine Fire Doors.SUPPLIERBasalt Quarry &Steel SlagI1.60 d1Coke/ElectricCupola MeltC/T 393 sI1.40 d24-Wheel CascadeFiber SpinC/T 498 sI2.20 d3Pendulum Fleece &CrimpingC/T 619 sI1.30 d4Phenolic CuringOven 240°CC/T 451 sI1.10 d5Saw Trim & HoodShrink PackC/T 347 sI2.00 dCUSTOMERCladding &Marine Fire…140 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Coke/Electric Cupola Melt393 s20 min96%99.1%210224 (1.60 d)194
2. 4-Wheel Cascade Fiber Spin498 s40 min95%97.6%210196 (1.40 d)148
3. Pendulum Fleece & Crimping619 s45 min84%94.8%140308 (2.20 d)101
4. Phenolic Curing Oven 240°C451 s20 min92%97.8%84182 (1.30 d)158
5. Saw Trim & Hood Shrink Pack347 s10 min97%99.2%70154 (1.10 d)221

Key figures

Takt time
579 s
Lead time
9.63 d
Value-added time
2,308 s
Process cycle efficiency (PCE)
0.30%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
140 tonnes
Line capacity per day
101 tonnes
Bottleneck
Pendulum Fleece & Crimping

Reading the bottleneck

The bottleneck is "Pendulum Fleece & Crimping": it can process 101 tonnes per day against a demand of 140 tonnes, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 619 s to 777 s, against a takt of 579 s. The largest loss at this step is equipment downtime (uptime 84%), about 118 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.