Borosilicate 5.1 Neutral Pharma Glass Tube Draw

Product family: Rotary Mandrel Drawn Tubes.

Flow: Pure Quartz & Boron → Electric Boost Tank Melting → Rotating Mandrel Draw → Laser OD/Wall Closed-Loop → Flame Cut 1.5m Ends & Anneal → Hydrolytic USP Type-I Release → Vial & Syringe Converters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Borosilicate 5.1 Neutral Pharma Glass Tube DrawSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pure Quartz & Boron → Electric Boost Tank Melting (1,311 s) → Rotating Mandrel Draw (1,659 s) → Laser OD/Wall Closed-Loop (2,064 s) → Flame Cut 1.5m Ends & Anneal (1,504 s) → Hydrolytic USP Type-I Release (1,157 s) → Vial & Syringe Converters.SUPPLIERPure Quartz &BoronI1.60 d1Electric BoostTank MeltingC/T 1,311 sI1.40 d2Rotating MandrelDrawC/T 1,659 sI2.19 d3Laser OD/WallClosed-LoopC/T 2,064 sI1.31 d4Flame Cut 1.5mEnds & AnnealC/T 1,504 sI1.10 d5Hydrolytic USPType-I ReleaseC/T 1,157 sI2.00 dCUSTOMERVial & SyringeConverters42 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Electric Boost Tank Melting1,311 s20 min96%99.1%6367 (1.60 d)58
2. Rotating Mandrel Draw1,659 s40 min95%97.6%6359 (1.40 d)44
3. Laser OD/Wall Closed-Loop2,064 s45 min84%94.8%4292 (2.19 d)30
4. Flame Cut 1.5m Ends & Anneal1,504 s20 min92%97.8%2555 (1.31 d)47
5. Hydrolytic USP Type-I Release1,157 s10 min97%99.2%2146 (1.10 d)66

Key figures

Takt time
1,929 s
Lead time
9.69 d
Value-added time
7,695 s
Process cycle efficiency (PCE)
0.98%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
42 tonnes
Line capacity per day
30 tonnes
Bottleneck
Laser OD/Wall Closed-Loop

Reading the bottleneck

The bottleneck is "Laser OD/Wall Closed-Loop": it can process 30 tonnes per day against a demand of 42 tonnes, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 2,064 s to 2,592 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 393 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.