2.0mm Patterned Anti-Reflective Solar PV Glass
Product family: Ultra-Clear Low-Iron Fronts.
Flow: Low-Iron Silica (<100ppm Fe) → Oxy-Fuel Low-Iron Tank Melt → Textured Pattern Roll Draw → Silica-Sol Roller AR Coating → 450°C Air-Quench Heat Treat → Elongation & Solar Transm QC → Solar Module Laminators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Oxy-Fuel Low-Iron Tank Melt | 12.2 s | 20 min | 96% | 99.1% | 6,750 | 7,200 (1.60 d) | 6,254 |
| 2. Textured Pattern Roll Draw | 15.5 s | 40 min | 95% | 97.6% | 6,750 | 6,300 (1.40 d) | 4,750 |
| 3. Silica-Sol Roller AR Coating | 19.3 s | 45 min | 84% | 94.8% | 4,500 | 9,900 (2.20 d) | 3,231 |
| 4. 450°C Air-Quench Heat Treat | 14.0 s | 20 min | 92% | 97.8% | 2,700 | 5,850 (1.30 d) | 5,077 |
| 5. Elongation & Solar Transm QC | 10.8 s | 10 min | 97% | 99.2% | 2,250 | 4,950 (1.10 d) | 7,110 |
Key figures
- Takt time
- 18.0 s
- Lead time
- 9.60 d
- Value-added time
- 71.8 s
- Process cycle efficiency (PCE)
- 0.009%
- Rolled throughput yield (RTY)
- 89.0%
- Customer demand per day
- 4,500 parts
- Line capacity per day
- 3,231 parts
- Bottleneck
- Silica-Sol Roller AR Coating
Reading the bottleneck
The bottleneck is "Silica-Sol Roller AR Coating": it can process 3,231 parts per day against a demand of 4,500 parts, so it falls short of demand by 28.2%. Once downtime and scrap are counted, its cycle time grows from 19.3 s to 24.2 s, against a takt of 18.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 3.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Glass, Ceramics & Mineral Wool: Glass, Ceramics & Mineral Wool
- 700-Ton/Day Tin-Bath Architectural Float Glass
- Low-E Solar-Control Tempered Facade Glass
- 120x240cm Large-Format Porcelain Slab Press
- High-Pressure Cast Vitreous China Toilet Bowl
- Borosilicate 5.1 Neutral Pharma Glass Tube Draw
- Recycled-Glass Fiberglass Insulation Batt Line
- Triple-Glazed Argon-Filled Warm-Edge IGU Unit
- 99.8% Isostatic Technical Alumina Ceramics
- Lead-Free Titanium Crystal Stemware Blowing
- 1550°C Basalt Rockwool Fire-Barrier Slab Line
- IS 10-Section Amber Beer/Pharma Glass Container