Plastic Injection & Extrusion VSM Scenarios
12 scenarios of Plastic Injection & Extrusion, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Resin Drying & Feed → 250T Injection Molding → Camera Vision QC → Ultrasonic Insert Assembly → Carton Packing & Pallet. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 250T Plastic Injection & Assembly | 4,200 parts per day | 3 | 19.3 s | 8.80 d | 0.010% | 250T Injection Press |
| 20L UN-Certified HDPE Chemical Jerrycan | 3,600 units per day | 3 | 22.5 s | 8.80 d | 0.012% | Continuous Accumulator Blow |
| Triple-Chamber Calcium-Zinc PVC Window Profile | 2,800 parts per day | 3 | 28.9 s | 8.80 d | 0.016% | Twin-Screw Conical Extrude |
| 8.7m Biaxially Oriented BOPP Packaging Film | 140 tonnes per day | 3 | 579 s | 8.83 d | 0.31% | MDO Longitudinal Stretch |
| 2000L UV-Stabilized Rotomolded Water Tank | 95 units per day | 2 | 568 s | 8.85 d | 0.46% | Tri-Arm Biaxial Gas Oven |
| Food-Grade Mono-rPET Thermoformed Meat Tray | 68,000 units per day | 3 | 1.2 s | 8.80 d | 0.001% | Co-Extruded ABA Sheet Roll |
| Inline Emitter Precision Drip Irrigation Pipe | 4,200 packs per day | 3 | 19.3 s | 8.80 d | 0.010% | Melt Extrude & Emitter Insert |
| Carbon-Fiber PEEK Metal-Replacement Bracket | 650 parts per day | 2 | 83.1 s | 8.81 d | 0.067% | 180°C Mold Tool High-Pressure |
| Graphite-Enhanced EPS Thermal Insulation Block | 1,800 parts per day | 2 | 30.0 s | 8.80 d | 0.024% | 24h Pentane Aging Silos |
| Pharma Medical PETG Sterile Barrier Blister Sheet | 85 batches per day | 3 | 953 s | 8.86 d | 0.51% | Flat-Die Polishing Calender |
| 9-Layer EVOH Retort Spouted Stand-Up Pouch | 95,000 packs per day | 3 | 0.9 s | 8.80 d | 0.001% | Rotogravure Solventless Lam |
| Home-Compostable PBAT/PLA Mulch & Bag Film | 45 tonnes per day | 2 | 1,200 s | 8.91 d | 0.96% | Dual-Lip Air Ring Blown Film |