20L UN-Certified HDPE Chemical Jerrycan
Product family: Stackable Industrial Cans.
Flow: Regional High-MW HDPE Producer → Silo Blender Masterbatch → Continuous Accumulator Blow → Auto Deflash & Neck Trim → 100% Air-Decay Leak Check → Robotic Bag & Pallet Stack → Chemical & Ag Formulators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Silo Blender Masterbatch | 14.4 s | 20 min | 96% | 99.4% | 5,400 | 5,760 (1.60 d) | 5,315 |
| 2. Continuous Accumulator Blow | 24.1 s | 95 min | 82% | 96.5% | 7,200 | 7,920 (2.20 d) | 2,566 |
| 3. Auto Deflash & Neck Trim | 16.2 s | 15 min | 93% | 97.5% | 1,800 | 5,040 (1.40 d) | 4,433 |
| 4. 100% Air-Decay Leak Check | 18.9 s | 20 min | 91% | 98.2% | 1,800 | 4,320 (1.20 d) | 3,716 |
| 5. Robotic Bag & Pallet Stack | 13.0 s | 10 min | 97% | 99.6% | 1,440 | 3,240 (0.90 d) | 5,908 |
Key figures
- Takt time
- 22.5 s
- Lead time
- 8.80 d
- Value-added time
- 86.6 s
- Process cycle efficiency (PCE)
- 0.012%
- Rolled throughput yield (RTY)
- 91.5%
- Customer demand per day
- 3,600 units
- Line capacity per day
- 2,566 units
- Bottleneck
- Continuous Accumulator Blow
Reading the bottleneck
The bottleneck is "Continuous Accumulator Blow": it can process 2,566 units per day against a demand of 3,600 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 24.1 s to 30.5 s, against a takt of 22.5 s. The largest loss at this step is equipment downtime (uptime 82%), about 5.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Plastic Injection & Extrusion: Plastic Injection & Extrusion
- 250T Plastic Injection & Assembly
- Triple-Chamber Calcium-Zinc PVC Window Profile
- 8.7m Biaxially Oriented BOPP Packaging Film
- 2000L UV-Stabilized Rotomolded Water Tank
- Food-Grade Mono-rPET Thermoformed Meat Tray
- Inline Emitter Precision Drip Irrigation Pipe
- Carbon-Fiber PEEK Metal-Replacement Bracket
- Graphite-Enhanced EPS Thermal Insulation Block
- Pharma Medical PETG Sterile Barrier Blister Sheet
- 9-Layer EVOH Retort Spouted Stand-Up Pouch
- Home-Compostable PBAT/PLA Mulch & Bag Film