9-Layer EVOH Retort Spouted Stand-Up Pouch

Product family: Aluminum-Free High Barrier.

Flow: EVOH & PA/PE Resin Producer → 9-Layer Co-Ex Blown Film → Rotogravure Solventless Lam → Pouch Form & Ultrasonic Spout → 100% Leak Burst & Camera → Pre-Made Boxed Cartons → Baby Food & Sauce Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 9-Layer EVOH Retort Spouted Stand-Up PouchSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. EVOH & PA/PE Resin Producer → 9-Layer Co-Ex Blown Film (1.2 s) → Rotogravure Solventless Lam (1.2 s) → Pouch Form & Ultrasonic Spout (1.2 s) → 100% Leak Burst & Camera (1.2 s) → Pre-Made Boxed Cartons (1.2 s) → Baby Food & Sauce Brands.SUPPLIEREVOH & PA/PEResin ProducerI1.60 d19-Layer Co-ExBlown FilmC/T 1.2 sI2.20 d2RotogravureSolventless LamC/T 1.2 sI1.40 d3Pouch Form &Ultrasonic SpoutC/T 1.2 sI1.20 d4100% Leak Burst &CameraC/T 1.2 sI0.90 d5Pre-Made BoxedCartonsC/T 1.2 sI1.50 dCUSTOMERBaby Food &Sauce Brands95,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 9-Layer Co-Ex Blown Film1.2 s20 min96%99.4%142,500152,000 (1.60 d)63,775
2. Rotogravure Solventless Lam1.2 s95 min82%96.5%190,000209,000 (2.20 d)51,533
3. Pouch Form & Ultrasonic Spout1.2 s15 min93%97.5%47,500133,000 (1.40 d)59,846
4. 100% Leak Burst & Camera1.2 s20 min91%98.2%47,500114,000 (1.20 d)58,532
5. Pre-Made Boxed Cartons1.2 s10 min97%99.6%38,00085,500 (0.90 d)64,005

Key figures

Takt time
0.9 s
Lead time
8.80 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
95,000 packs
Line capacity per day
51,533 packs
Bottleneck
Rotogravure Solventless Lam

Reading the bottleneck

The bottleneck is "Rotogravure Solventless Lam": it can process 51,533 packs per day against a demand of 95,000 packs, so it falls short of demand by 45.8%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 0.9 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.