250T Plastic Injection & Assembly

Product family: Technical Polymer Housings.

Flow: Regional PP Resin Distributor → Resin Drying & Feed → 250T Injection Press → Camera Vision QC → Insert Assembly → Carton Packing → OEM Appliance Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 250T Plastic Injection & AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Regional PP Resin Distributor → Resin Drying & Feed (12.3 s) → 250T Injection Press (20.6 s) → Camera Vision QC (13.9 s) → Insert Assembly (16.2 s) → Carton Packing (11.2 s) → OEM Appliance Assembly.SUPPLIERRegional PPResinDistributorI1.60 d1Resin Drying &FeedC/T 12.3 sI2.20 d2250T InjectionPressC/T 20.6 sI1.40 d3Camera Vision QCC/T 13.9 sI1.20 d4Insert AssemblyC/T 16.2 sI0.90 d5Carton PackingC/T 11.2 sI1.50 dCUSTOMEROEM ApplianceAssembly4,200 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Resin Drying & Feed12.3 s20 min96%99.4%6,3006,720 (1.60 d)6,222
2. 250T Injection Press20.6 s95 min82%96.5%8,4009,240 (2.20 d)3,002
3. Camera Vision QC13.9 s15 min93%97.5%2,1005,880 (1.40 d)5,167
4. Insert Assembly16.2 s20 min91%98.2%2,1005,040 (1.20 d)4,336
5. Carton Packing11.2 s10 min97%99.6%1,6803,780 (0.90 d)6,858

Key figures

Takt time
19.3 s
Lead time
8.80 d
Value-added time
74.2 s
Process cycle efficiency (PCE)
0.010%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
4,200 parts
Line capacity per day
3,002 parts
Bottleneck
250T Injection Press

Reading the bottleneck

The bottleneck is "250T Injection Press": it can process 3,002 parts per day against a demand of 4,200 parts, so it falls short of demand by 28.5%. Once downtime and scrap are counted, its cycle time grows from 20.6 s to 26.0 s, against a takt of 19.3 s. The largest loss at this step is equipment downtime (uptime 82%), about 4.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.