8.7m Biaxially Oriented BOPP Packaging Film

Product family: High-Barrier Metallized Reels.

Flow: PP Homopolymer Producer → Cast Sheet Chill-Roll Drum → MDO Longitudinal Stretch → TDO Stenter Transverse Oven → Vacuum Aluminum Metallize → High-Speed Slitter Jumbo → Snack & Flexible Converters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 8.7m Biaxially Oriented BOPP Packaging FilmSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. PP Homopolymer Producer → Cast Sheet Chill-Roll Drum (370 s) → MDO Longitudinal Stretch (619 s) → TDO Stenter Transverse Oven (417 s) → Vacuum Aluminum Metallize (486 s) → High-Speed Slitter Jumbo (336 s) → Snack & Flexible Converters.SUPPLIERPP HomopolymerProducerI1.60 d1Cast SheetChill-Roll DrumC/T 370 sI2.20 d2MDO LongitudinalStretchC/T 619 sI1.40 d3TDO StenterTransverse OvenC/T 417 sI1.20 d4Vacuum AluminumMetallizeC/T 486 sI0.90 d5High-SpeedSlitter JumboC/T 336 sI1.50 dCUSTOMERSnack &Flexible…140 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cast Sheet Chill-Roll Drum370 s20 min96%99.4%210224 (1.60 d)207
2. MDO Longitudinal Stretch619 s95 min82%96.5%280308 (2.20 d)100
3. TDO Stenter Transverse Oven417 s15 min93%97.5%70196 (1.40 d)172
4. Vacuum Aluminum Metallize486 s20 min91%98.2%70168 (1.20 d)145
5. High-Speed Slitter Jumbo336 s10 min97%99.6%56126 (0.90 d)229

Key figures

Takt time
579 s
Lead time
8.83 d
Value-added time
2,228 s
Process cycle efficiency (PCE)
0.31%
Rolled throughput yield (RTY)
91.5%
Customer demand per day
140 tonnes
Line capacity per day
100 tonnes
Bottleneck
MDO Longitudinal Stretch

Reading the bottleneck

The bottleneck is "MDO Longitudinal Stretch": it can process 100 tonnes per day against a demand of 140 tonnes, so it falls short of demand by 28.6%. Once downtime and scrap are counted, its cycle time grows from 619 s to 782 s, against a takt of 579 s. The largest loss at this step is equipment downtime (uptime 82%), about 136 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.